Find a Tender Service

Ramp Replacement for Small Vessel(s)

CalMac Ferries Limited

Awarded
goods
Framework agreement
Scotland

This goods contract from CalMac Ferries Limited is closed to new bids. It was awarded to Malin Group for £1,843,000 on 17 Dec 2021. Region: Scotland. Procedure: Open procedure.

Live now: tenders like this

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Region
Scotland
Location: Gourock
Delivery: United Kingdom
Contract value
£1,843,000ex VAT
Published
28 April 2022

Procurement

Procedure type
Open procedure
CPV classifications

Description

CFL would like to award a Framework Agreement to a single supplier for EPIC of replacement ramp systems on the MV LOCH STRIVEN with the option to replace ramps on the MV LOCH FYNE (subject to funding).

The ramp systems are to be engineered, procured, installed and commissioned, and shall meet Classification Society & Flag State requirements.

The design approval from Classification Society and Flag State for the installation is part of the successful suppliers' deliverables

Full description

CFL would like to award a Framework Agreement to a single supplier for EPIC of replacement ramp systems on the MV LOCH STRIVEN with the option to replace ramps on the MV LOCH FYNE (subject to funding).

The ramp systems are to be engineered, procured, installed and commissioned, and shall meet Classification Society & Flag State requirements.

The design approval from Classification Society and Flag State for the installation is part of the successful suppliers' deliverables.

Where possible, the ramp systems shall interface with existing vessel hardware and systems.

The ramp systems shall take into account the following;

The vessel operates in a variety of ports on the West Coast of Scotland and the Western Isles. The port infrastructure is comprised of either linkspans or slipways and is mostly protected by small harbors/piers and alignment structures.

The concrete slipways at the ports are at a gradient of 1:8.

Consideration shall be given to the port infrastructure in both Oban and Lismore.

The existing ramps act as an anchor on the port infrastructure. To achieve this, the vessel's propulsion system is kept running to keep the vessel centered on the port infrastructure.

The existing ramps weigh approximately 8000kg each Additional information: Evaluation Criteria will be detailed in the Invitation to Tender

Awarded supplier

Supplier
Award value
£1,843,000
Award date
17 December 2021

Contact

Address
Ferry Terminal, Gourock, PA19 1QP
Contact name
Steven McEwan

Identifiers

Buyer reference
AM21-079
Notice ID
010972-2022
OCID
ocds-h6vhtk-02dffd

Explore related tenders

External ID: fts-ocds-h6vhtk-02dffd • Added 20 August 2026

Get tenders like these by email

Tell us what you do and where you work. Every morning you get the new tenders that fit, from national portals and the buyer portals most services miss.

14 days of Pro, no card. Then Free unless you upgrade.