Manchester International Airport - Permanent Way Works

Kier Transportation - CP7 NWC

Live
Confirmed tender
works
SME-friendly

Key details

Contracting authority
Region
North West
Delivery: North West, United Kingdom
Contract value
£2,500,000ex VAT
Deadline
28 August 2026
Published
19 August 2026

Procurement

Contract period
16 January 2027 - 1 March 2028
1 years
CPV classifications
  • 45234130 Ballast construction works
  • 71631470 Railway-track inspection services
  • 71632000 Technical testing services
  • 45234116 Track construction works
  • 45234120 Urban railway works
  • 34941200 Track rails

Get alerts when Kier Transportation - CP7 NWC publishes again

Sign up free to get an email the next time Kier Transportation - CP7 NWC advertises a works contract.

What happened

The contract runs until 1 Mar 2028.

Description

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The scope areas for this package are as follows:

  • Track renewals and modifications.
  • Plain line track installation.
  • S&C installation and modifications (where applicable).
  • Ballast excavation, placement and regulation.
  • Stressing, welding and rail adjustments.
  • Tamping and dynamic track stabilisation.
  • Possession planning and delivery support.
  • Associated rail plant and labour resources.
  • Testing, handback and assurance documentation.

Contact

Address
2nd Floor Optimum House, Clippers Quay, M503XP
Contact name
Mark Thompson

Identifiers

Buyer reference
C4N117883646
Notice ID
408b191a-8dd5-41ec-bbd0-981d6925dde7-911255
OCID
ocds-b5fd17-60f352e0-01ed-497a-b058-28b41c90040d

Explore related tenders

External ID: cf-ocds-b5fd17-60f352e0-01ed-497a-b058-28b41c90040d • Added 19 August 2026