Manchester International Airport Phase 2 - Platform Civils
Kier Transportation - CP7 NWC
Kier Transportation - CP7 NWC is looking for a works contractor: Manchester International Airport Phase 2 - Platform Civils. Category: Drainage works. Estimated value £2,500,000. Bids close on 4 Dec 2026. Region: North West.
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
More tenders like this
- Civils Support DPS - South Region - Pre-QualificationNuclear Restoration Services Limited · £4,685,000 · Closes 26 October 2028
- Civils Support DPS - South East RegionMagnox Limited · £9,500,000 · Closes 10 February 2028
- L26041-T-MS - Civils Flexible FrameworkLondon Luton Airport Operations Limited · Closes 27 September 2031
- Guernsey Airport Terminal Building - Roof Remedial WorksStates of Guernsey · Closes 14 December 2026
- Transport for Greater Manchester Procurement of VehiclesTransport for Greater Manchester · Closes 9 December 2026
- 26076 Street Works Co-Ordination and TMC Network Monitoring PlatformCambridgeshire County Council · £400,000 · Closes 11 December 2026
Procurement
- 45232452 Drainage works sector
- 45234116 Track construction works sector
- 45340000 Fencing, railing and safety equipment installation work sector
- 45200000 Works for complete or part construction and civil engineering work sector
- 45432112 Laying of paving sector
- 44115100 Ducting sector
- 45233250 Surfacing work except for roads sector
- 45262210 Foundation work sector
- 45111240 Ground-drainage work sector
- 34946000 Railway-track construction materials and supplies sector
Description
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
The works comprise the construction and completion of the platform civils work at Manchester Airport Station.
- Platform demolition
- Asset recoveries
- Track walkway/crossings
- UTX
- Troughing
- Riser wall foundations
- New riser walls (blockwork and PCC)
- Copers (including realignment)
- Tactile paving
- Drainage (ACO's and carrier)
- Ducting
- Equipment foundations (in-situ and PCC)
- Waiting shelter foundations
- Platform furniture
- SME works (end of platform ramps)
- Fencing/Gate works
- Block paving/surfacing
- Associated reinstatement works