Cwmystwyth Planning and Design
Mining Remediation Authority
This tender has closed
The submission deadline for this contract has passed. There may be more active services tenders from Mining Remediation Authority, and hundreds more across the UK public sector.
Key details
Procurement
- 71356400 Technical planning services
What happened
Mining Remediation Authority awarded this contract to Jeremy Benn Associates Ltd worth £421,540 on 12 Nov 2025. The contract runs until 31 Dec 2027.
Description
The principle, long term objective of the Cwmystwyth project is the reduction of metal loadings entering the Afon Ystwyth from the Cwmystwyth site. The proposed works aim to significantly reduce (by up to 50% immediately downstream) concentrations / loadings of dissolved lead and zinc in the Ystwyth, as well as a significant (but currently unquantifiable) reduction in the amount of fine grained, metal rich sediment newly entering the main river system through erosion of exposed spoil and in channel deposits at Cwmystwyth (and associated dissolved phase contamination from leaching). The works aim to directly improve a stretch, estimated at 7km, of the river downstream of Cwmystwyth.
Project objectives are to:
- Deliver water quality betterment in the receiving waterbody that will achieve wider environmental benefits.
- Maintain and enhance the natural environment and the well-bring of the community. Helping to achieve NRW Well-Bring Objectives and Environment (Wales) Act duties.
- Engage the community and internal and external stakeholders to deliver an acceptable solution.
- Minimise impacts to ecology and heritage - the site has numerous high value and sensitive environmental receptors and has 5 formal environmental designations and linked hydraulically to three more designated sites.
Awarded supplier
Contact
Identifiers
Explore related tenders
Other tenders from Mining Remediation Authority
View all →External ID: cf-ocds-b5fd17-52d28c60-d3d0-40e9-b28a-f78e8a939bd9 • Added 29 April 2026