A66 - Frc
Balfour Beatty Civil Engineering Limited
This tender is closed to new bids.
Live now: tenders like this
- Linstone Housing - RAAC Removal and Roof Replacement Works to existing propertiesLinstone Housing AssociationCloses 11 December 2026
- Provision of Roofing ServicesUHI North,West and HebridesCloses 11 January 2027
- Roof Refurbishment Works at Scoil Padre Pio Churchfield Terrace West, Churchfield, CorkScoil Padre PioCloses 11 December 2026
- Fusion21 Construction & Refurbishment Framework (2027-31)Fusion 21 FoundationCloses 8 January 2027
- CHIC Roofing FrameworkCommunities & Housing Investment Consortium Ltd (CHIC)Closes 18 December 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 45262310 Reinforced-concrete work
What happened
The contract runs until 20 Feb 2028.
Description
The package covers, but is not limited to, the following structural components:
Abutments, including bearing shelves, backwalls, and associated retaining elements Wing walls including reinforcement details, formwork, concrete placement, and tie-ins Central pier, where applicable, based on design Placing of pre-cast deck panels, including the stitched slab, diaphragms, upstands and any longitudinal or transverse construction joints Installation precast parapet plinths and associated edge thickening or upstand requirements Any additional minor or connecting works required to complete the structure to specification
In addition to the primary structural FRC installation, the package includes full responsibility for all associated temporary works and ancillary requirements, including:
Temporary works design, supply and installation, inclusive of falsework, propping, support systems, working platforms and stability measures Testing and control activities, including concrete cube testing, slump testing, rebar inspection hold points, and pour records Curing systems and processes including curing membranes, coverings, and controlled curing regimes Concrete temperate monitoring, including the provision and management of sensors where required Access and edge protection systems including surface preparation, treatment, defect rectification (if required) and final concrete finishes All labour, plant, materials, consumables, and supervision to deliver a fully compliant structure
The contractor will be required to coordinate their works with adjacent section 3b activities and provide all necessary RAMS, ITPs, quality records, and as-built-information to support completion of Centre Parcs overbridge.
Contact
Identifiers
Explore related tenders
External ID: cf-ocds-b5fd17-93cf6f64-e302-4b8e-9b23-f123eeee00f6 • Added 29 April 2026