Contracts Finder

SZC CWA - Pool Bunker Construction

Sizewell C Limited

Live
Confirmed tender
goods
SME-friendly

Sizewell C Limited is looking for a supplier of goods: SZC CWA - Pool Bunker Construction. Category: Building construction work. Estimated value £20,000,000. Bids close on 25 Nov 2026. Region: London.

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Region
London
Delivery: British Oversea Territories
Contract value
£20,000,000ex VAT
Deadline
25 November 2026
Published
19 November 2026

More tenders like this

Procurement

Contract period
6 May 2027 - 31 October 2028
1 years
CPV classifications

Description

The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island.

The scope of works includes:

  • Primary steel frame and crane runway beams.
  • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope.
  • Five-section retractable roof.
  • Secondary steelwork platforms, working levels and access arrangements.
  • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls.
  • Passenger and goods hoists, stair cores and roof access.
  • Installation and commissioning of three free-issued gantry cranes.
  • Tented workshop, lightning protection and earthing.
  • Testing, commissioning, quality records and formal handover.

The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme.

The key scope deliverables are:

  • Completed design to RIBA stage 4 and coordinated construction information.
  • Approved contractor programme aligned to project milestones.
  • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services.
  • Completed health, safety, quality and assurance records.
  • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements.
  • Formal handover following operational readiness review.

The timescales are as follows:

The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is:

  • 40 weeks for the preferred rainscreen and Safe RAD solution.
  • 46 weeks for the 275 mm precast fallback solution.

The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.

Contact

Address
90 Whitfield Street, London, W1T4EZ
Contact name
Oliver Stapley

Identifiers

Buyer reference
C4N123459812
Notice ID
0a92843d-9da8-4c16-b682-33b5d72727db-922031
OCID
ocds-b5fd17-56721387-b61e-4164-a5d2-3509e5e4cbc9

Explore related tenders

External ID: cf-ocds-b5fd17-56721387-b61e-4164-a5d2-3509e5e4cbc9 • Added 19 November 2026

Get tenders like these by email

Tell us what you do and where you work. Every morning you get the new tenders that fit, from national portals and the buyer portals most services miss.

14 days of Pro, no card. Then Free unless you upgrade.