Principal Designer and Project Lead for the Refurbishment of Aberkenfig Library

Awen Cultural Trust

Live
Confirmed tender
services
Wales

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Region
Bridgend and Neath Port Talbot
Contract value
£20,000ex VAT
Deadline
4 December 2026
Published
6 November 2026

Procurement

Procedure type
Single stage
CPV classifications
  • 71200000 Architectural and related services
  • 71220000 Architectural design services
  • 71221000 Architectural services for buildings
  • 71240000 Architectural, engineering and planning services
  • 71242000 Project and design preparation, estimation of costs
  • 71245000 Approval plans, working drawings and specifications
  • 71247000 Supervision of building work
  • 71248000 Supervision of project and documentation
  • 71250000 Architectural, engineering and surveying services

Description

Awen Cultural Trust seeks to appoint a Principal Designer and project lead to develop costed, tender-ready plans for the refurbishment of Aberkenfig Library, along with the subsequent procurement of contractor and management of works. The aim is to create a modern, fit-for-purpose library and community hub with a range of environmental improvements.

The aim is to have the necessary deliverables in place to realise the project according to the funding timescales and requirements of Welsh Government’s Transformation Capital Grant scheme.

Awen wish to appoint a Principal Architect/project lead to act as Principal Designer (CDM 2015) and coordinate a team capable of fulfilling the roles below in response to the scale and objectives of the brief.

Core disciplines and specialisms

Architect – produce plans, advise on any planning considerations, planning application if required.

Structural Engineer – to advise as necessary.

Building Services (MEP) Engineer – heating/ventilation improvements, small power, data, accessibility systems; advice on low‑energy solutions.

Cost Consultant / QS – provide cost planning, value engineering, risk allowances and procurement options.

Principal Designer (CDM) – pre‑construction information, design risk management, and H&S file.

Design Brief – Outcomes Required

Main Library

Removal of existing counter (smaller staff desk to be relocated elsewhere). Note that the fit-out of the library space will be considered separately.

Options to improve the foyer area to present a more welcoming and useable space.

Incorporate a meeting room (capacity c.8-10 persons) within the ground floor footprint, potentially in the existing children’s area.

Incorporate a small, confidential room (capacity c.2 persons) within the ground floor footprint.

Advice on possible lighting improvements.

Additional power/data as required.

New flooring and redecoration throughout.

Sanitary Provision

Improvement to existing staff WC.

Creation of accessible Changing Places-type WC for public use.

Creation of a unisex public WC.

Staff Area

New flooring and redecoration as necessary.

Storage - provision of storage space to support office and workspace functions.

Environmental & Sustainability Improvements

New windows throughout.

Replace existing gas boiler with air-source heat pump providing heating and air-conditioning, including new radiators.

Installation of solar PV panels to roof.

Installation of battery storage.

Inclusivity & Operations

Consideration to Equality Act 2010, applicable Building Regulations and inclusive-design requirements in Wales; dementia‑aware design cues; pram/buggy parking; storage rationalisation to keep spaces uncluttered.

The outcomes indicated above cover the expected scope of the refurbishment project at the time of writing. We will be happy to discuss with the designer any proposed amendments to the above to improve the scheme and/or meet the financial envelope.

Deliverables Phase 1

The following are indicative of the deliverables required but can be flexed to meet the scale and eventual design of the project and programme.

Concept Design

RIBA Stage 3 level or equivalent report suitable for project of this scale, with drawings as required for funding application

Stage‑3 level cost plan with options and risk allowances, sufficient for funding application.

Coordinated GA drawings, room data sheets, interior schedules (finishes, ironmongery), technical sections.

Planning Consents and support for funding submission

Deliverables Phase 2

Technical Design for Minor Works Contract

Full tender pack: specifications (including interior spec), coordinated drawings, schedules (FF&E, lighting, AV, MEP).

Pre‑construction information (CDM), design risk register, and contractor tender queries support.

Management and advisory during procurement/construction (PCSA, design queries).

Surveys & Information (to be allowed for)

Measured survey (if existing data insufficient) and opening‑up works to verify structure.

Structural checks;

Full description

Awen Cultural Trust seeks to appoint a Principal Designer and project lead to develop costed, tender-ready plans for the refurbishment of Aberkenfig Library, along with the subsequent procurement of contractor and management of works. The aim is to create a modern, fit-for-purpose library and community hub with a range of environmental improvements. The aim is to have the necessary deliverables in place to realise the project according to the funding timescales and requirements of Welsh Government’s Transformation Capital Grant scheme. Awen wish to appoint a Principal Architect/project lead to act as Principal Designer (CDM 2015) and coordinate a team capable of fulfilling the roles below in response to the scale and objectives of the brief. Core disciplines and specialisms Architect – produce plans, advise on any planning considerations, planning application if required. Structural Engineer – to advise as necessary. Building Services (MEP) Engineer – heating/ventilation improvements, small power, data, accessibility systems; advice on low‑energy solutions. Cost Consultant / QS – provide cost planning, value engineering, risk allowances and procurement options. Principal Designer (CDM) – pre‑construction information, design risk management, and H&S file. Design Brief – Outcomes Required Main Library Removal of existing counter (smaller staff desk to be relocated elsewhere). Note that the fit-out of the library space will be considered separately. Options to improve the foyer area to present a more welcoming and useable space. Incorporate a meeting room (capacity c.8-10 persons) within the ground floor footprint, potentially in the existing children’s area. Incorporate a small, confidential room (capacity c.2 persons) within the ground floor footprint. Advice on possible lighting improvements. Additional power/data as required. New flooring and redecoration throughout. Sanitary Provision Improvement to existing staff WC. Creation of accessible Changing Places-type WC for public use. Creation of a unisex public WC. Staff Area New flooring and redecoration as necessary. Storage - provision of storage space to support office and workspace functions. Environmental & Sustainability Improvements New windows throughout. Replace existing gas boiler with air-source heat pump providing heating and air-conditioning, including new radiators. Installation of solar PV panels to roof. Installation of battery storage. Inclusivity & Operations Consideration to Equality Act 2010, applicable Building Regulations and inclusive-design requirements in Wales; dementia‑aware design cues; pram/buggy parking; storage rationalisation to keep spaces uncluttered. The outcomes indicated above cover the expected scope of the refurbishment project at the time of writing. We will be happy to discuss with the designer any proposed amendments to the above to improve the scheme and/or meet the financial envelope. Deliverables Phase 1 The following are indicative of the deliverables required but can be flexed to meet the scale and eventual design of the project and programme. Concept Design RIBA Stage 3 level or equivalent report suitable for project of this scale, with drawings as required for funding application Stage‑3 level cost plan with options and risk allowances, sufficient for funding application. Coordinated GA drawings, room data sheets, interior schedules (finishes, ironmongery), technical sections. Planning Consents and support for funding submission Deliverables Phase 2 Technical Design for Minor Works Contract Full tender pack: specifications (including interior spec), coordinated drawings, schedules (FF&E, lighting, AV, MEP). Pre‑construction information (CDM), design risk register, and contractor tender queries support. Management and advisory during procurement/construction (PCSA, design queries). Surveys & Information (to be allowed for) Measured survey (if existing data insufficient) and opening‑up works to verify structure. Structural checks; services condition review; asbestos R&D survey Achieve 3 tender returns for the works in accordance with Welsh Government Transformation Capital Grant procurement requirements and general funding good practice. Successful bidder to lead the tender and evaluation process. Budget, Cost Plan & Value Management Establish full project cost-plan to include works, fixed equipment and environmental enhancements. For the purposes of fee proposals and design we estimate a works-contract affordability range of £150,000 to £200,000. Costed design proposals should not exceed this envelope due to funding constraints. As indicated in Section 2.1 above, library fit-out works are excluded from the scope of this tender. NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=173141. The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx. Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

£20,000

Additional information

This notice has been sent as a region specific notice. If you did not receive an alert about this you are not based in the specific region selected by the buying authority. Questions on why this was sent as a region specific notice should be sent to the buying authority.

(WA Ref:173141)

Contact

Address
Stable Offices, Bryngarw House, Brynmenyn, Bridgend, CF32 8UU
Contact name
Richard Bellinger

Explore related tenders

External ID: s2w-NOV675116 • Added 6 November 2026

Get tenders like these by email

Tell us what you do and where you work. Every morning you get the new tenders that fit, from national portals and the buyer portals most services miss.