Contracts Finder

Manchester International Airport Phase 2 - Overbridge Civils

Kier Transportation - CP7 NWC

Awaiting award decision
works
Private sector
Subcontract
SME-friendly

This works tender from Kier Transportation - CP7 NWC closed on 30 Oct 2026. Estimated value £1,000,000. The contract end date is 1 Jul 2027. Region: North West.

Live now: tenders like this

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Region
North West
Delivery: North West, United Kingdom
Contract value
£1,000,000ex VAT
Deadline
30 October 2026(expired)
Published
23 October 2026

Procurement

Contract period
27 February 2027 - 1 July 2027
5 months
CPV classifications

Description

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including:

  • Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections.
  • Modification of existing bridge cill.
  • Supply and installation of bridge bearing plates, including associated screed works.
  • Construction of pile caps/infill.
  • Placement of in-situ concrete shear key infill.
  • Construction of the reinforced concrete bridge deck slab.
  • Construction of reinforced concrete parapet walls.
  • Placement of in-situ concrete footpaths and fill areas.
  • Construction of pilasters, including reinforced concrete and brickwork elements.
  • Supply and installation of parapet and pilaster copings.
  • Construction of associated fencing, signage and PCC retaining wall.
  • Installation of associated ducting works.
  • Completion of highway works excluding final road surfacing.
  • Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works.
  • Construction of associated drainage works.

Exclusions: Final road/footpath surfacing works are excluded from this scope.

Contact

Address
2nd Floor Optimum House, Clippers Quay, M503XP
Contact name
Mark Thompson

Identifiers

Buyer reference
C4N121956709
Notice ID
95829fc3-7441-4732-aadd-5507054df0b7-919052
OCID
ocds-b5fd17-c521aea8-943c-4f70-9efa-654205db5376

Explore related tenders

External ID: cf-ocds-b5fd17-c521aea8-943c-4f70-9efa-654205db5376 • Added 23 October 2026

Get tenders like these by email

Tell us what you do and where you work. Every morning you get the new tenders that fit, from national portals and the buyer portals most services miss.

14 days of Pro, no card. Then Free unless you upgrade.