Manchester International Airport Phase 2 - Overbridge Civils
Kier Transportation - CP7 NWC
This works tender from Kier Transportation - CP7 NWC closed on 30 Oct 2026. Estimated value £1,000,000. The contract end date is 1 Jul 2027. Region: North West.
Live now: tenders like this
- Manchester International Airport Phase 2 - Platform CivilsKier Transportation - CP7 NWC£2,500,000 · Closes 4 December 2026
- Civils Support DPS - South Region - Pre-QualificationNuclear Restoration Services Limited£4,685,000 · Closes 26 October 2028
- Guernsey Airport Terminal Building - Roof Remedial WorksStates of GuernseyCloses 14 December 2026
- Civils Support DPS - South East RegionMagnox Limited£9,500,000 · Closes 10 February 2028
- L26041-T-MS - Civils Flexible FrameworkLondon Luton Airport Operations LimitedCloses 27 September 2031
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 45233210 Surface work for highways sector
- 45232452 Drainage works sector
- 45223500 Reinforced-concrete structures sector
- 45221100 Construction work for bridges sector
- 45233253 Surface work for footpaths sector
- 44115100 Ducting sector
- 45221110 Bridge construction work sector
- 44831100 Mastics sector
- 45261420 Waterproofing work sector
Description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including:
- Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections.
- Modification of existing bridge cill.
- Supply and installation of bridge bearing plates, including associated screed works.
- Construction of pile caps/infill.
- Placement of in-situ concrete shear key infill.
- Construction of the reinforced concrete bridge deck slab.
- Construction of reinforced concrete parapet walls.
- Placement of in-situ concrete footpaths and fill areas.
- Construction of pilasters, including reinforced concrete and brickwork elements.
- Supply and installation of parapet and pilaster copings.
- Construction of associated fencing, signage and PCC retaining wall.
- Installation of associated ducting works.
- Completion of highway works excluding final road surfacing.
- Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works.
- Construction of associated drainage works.
Exclusions: Final road/footpath surfacing works are excluded from this scope.
Contact
Identifiers
Explore related tenders
External ID: cf-ocds-b5fd17-c521aea8-943c-4f70-9efa-654205db5376 • Added 23 October 2026