RBGKEW1174 Decarbonisation Project - Jodrell Laboratories and Melon Yard
Royal Botanic Gardens
This tender has closed
The submission deadline for this contract has passed. There may be more active works tenders from Royal Botanic Gardens, and hundreds more across the UK public sector.
Key details
Procurement
- 45000000 Construction work
What happened
Royal Botanic Gardens awarded this contract to Alternative Heat Ltd worth £4,933,168 on 12 May 2023. The contract runs until 31 Mar 2024.
Description
RBG Kew are undertaking a project to decarbonise the Jodrell laboratories and adjacent glasshouses. You are hereby invited by RBG Kew to submit a tender to meet the Customer's requirements in accordance with the specification and associated documents as contained within the tender pack. Additional Information: For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.
delta-esourcing. com/tenders/UK-UK-Richmond:-Construction-work. /85C3B88GS2 To respond to this opportunity, please click here: https://www.
delta-esourcing. com/respond/85C3B88GS2 Suppliers will be required to register with Delta, if not already registered. All tender documents can only be accessed via Delta.
If you experience any technical difficulties from accessing the above url, then please contact the Delta eSourcing Helpdesk on call 0800 923 9236 or email helpdesk@delta-esourcing. com.
Full description
Project Description and Programme Details
Kew Gardens are undertaking a project to decarbonise the Jodrell laboratories and adjacent glasshouses.
The scope of work is the following:
1 Install and commission a temporary heating system to supply the Jodrell and Mellon Yard for the
duration of the project.
2 Strip-out the existing basement level boiler room (including removal of asbestos), remove all pipework
and plant, remove oil tanks and superstructure to facilitate citing the main air source heat pump.
3 Construct a new plant room at ground level to house heating system and associated plant and
materials.
4 Install connect and commission a new electrically powered heating system air source heat pumps and
direct electric boilers.
5 Replacement of the existing air handling unit that supplies the Lecture Theatre. To include cleaning and
repairing ductwork and repair/ replacement of all controls as necessary.
6 Installation of new Solar Photo Voltaic array at roof level, on the Wolfson Wing and Jodrell roofs to
generate electricity on an annual basis and offset the increased demand from the new heating system.
7 Allow for liaising with UKPN and negotiating installation of an upgraded 1.2kVA supply including new
transformer main cable and intake position to meet the needs of the project.
8 In anticipation of the new electrical supply, implement the construction of new LV switch room
including all connections (including trenching), new LV panel, replacement of Gent, migration and
switchover to the new supply.
9 Install and commission new uprated stand-by generator to cover the increased electrical load of the
buildings
Awarded supplier
Contact
Identifiers
Explore related tenders
External ID: cf-ocds-b5fd17-56ad25e9-b578-4dd7-9af4-7433f1346a6b • Added 4 October 2026