Highway Works Multiple Lots Framework - HDG/2023/461
Stoke-on-Trent City Council
This tender has closed
The submission deadline for this contract has passed. There may be more active works tenders from Stoke-on-Trent City Council, and hundreds more across the UK public sector.
Key details
Procurement
- 45233000 Construction, foundation and surface works for highways, roads
What happened
Stoke-on-Trent City Council awarded this contract to Bealine Groundworks Ltd | Cashelton Construction Ltd | Connor Construction (South West) Ltd | GN Groundworks Limited | keble heath construction ltd | NMS Civil Engineering Ltd | Springett Surfacing | Bridge Construction Ltd | Glyn Walley Groundworks Limited | Haystoun Construction Ltd | Kilkern | Multevo Ltd | Roy Beech (Contractors) Ltd | The Casey Group Ltd | Fitzgerald Contractors Ltd | H & G Ash | KIELY BROS LTD | WJ Roadmarkings Ltd worth £16,000,000 on 20 Dec 2023. The contract runs until 31 Oct 2027.
Description
The City Council's Highways Operations Division is responsible for maintenance of the adopted highway network in Stoke-on-Trent. The creation of this framework will provide increased capacity to enable the team to meet in-coming demand. During any periods where demand is greater than capacity, additional resources will be drawn down through the framework. This framework will be divided into Lots and will cover the following activities: \r
• Carriageway patching and pot-hole works\r
• Small to medium scale resurfacing works\r
• Minor Road Repairs - Labour day rated\r
• Car park constructions\r
• Drainage infrastructure repairs and installations \r
• Vehicle access crossing points\r
• Paving and footway works \r
• Specialist paving works \r
• Civil Engineering Projects\r
Full description
Work schemes will be inclusive of but not limited to:
- Vehicle access crossings for both domestic and commercial premises
- New design and Footway construction works
- New design and Carriageway construction works
- New design and Drainage installation works
- Ducting installation works
- Kerbing works either new lines or maintenance of existing ones
- Paving works either lift and relay or renew
- Design and Construction of new small car parks up to 40 spaces
- Design and construction of Section 38 works forming new junctions and accesses on public
highway
- Design and construction of Section 278 works alterations to the existing highway
- Small elements of landscaping and planting to compliment the scheme
- Small elements of road marking
- Designing of small safety schemes to include junction improvements and traffic calming and
pedestrian safety schemes.
- Designing and construction of small sustainable urban drainage design schemes to either new
or existing infrastructure.
- Temporary works designs
Awarded suppliers (18)
- Bealine Groundworks Ltd
- Cashelton Construction Ltd
- Connor Construction (South West) Ltd
- GN Groundworks Limited
- keble heath construction ltd
- NMS Civil Engineering Ltd
- Springett Surfacing
- Bridge Construction Ltd
- Glyn Walley Groundworks Limited
- Haystoun Construction Ltd
- Kilkern
- Multevo Ltd
- Roy Beech (Contractors) Ltd
- The Casey Group Ltd
- Fitzgerald Contractors Ltd
- H & G Ash
- KIELY BROS LTD
- WJ Roadmarkings Ltd
Contact
Identifiers
Explore related tenders
Other tenders from Stoke-on-Trent City Council
View all →External ID: cf-ocds-b5fd17-2139dbbb-6b37-48ce-97c0-40f7fa0788ca • Added 3 October 2026