Forum Tower - Masonry Removal
Westmorland and Furness Council
This works tender from Westmorland and Furness Council closed on 3 Nov 2023. It was awarded to Leck Construction Ltd for £448,326 on 12 Jan 2024. The contract end date is 25 Jun 2024. Region: North West.
Contracts like this usually come back out to tender before they end.
Live now: tenders like this
- Layard House - Wastewater RemovalIpswich Borough Council£65,000 · Closes 16 December 2026
- The Piggery - Site Clearance, Demolition and Waste RemovalCirencester Town Council£55,000 · Closes 31 January 2027
- Linstone Housing - RAAC Removal and Roof Replacement Works to existing propertiesLinstone Housing AssociationCloses 11 December 2026
- DPS - Ash and Dangerous Tree Roadside Removal - West DistrictForestry England£1,000,000 · Closes 23 February 2029
- Gas Meter Removal and InstallationsProcurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton)£100,000,000 · Closes 31 May 2029
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
Description
Westmorland and Furness Council requested WSP to complete a scope for intrusive works to the stair core known as the Forum Tower in the North-West corner of the Forum Building.
The building including stair core was constructed in the late 1960's and comprises a steel frame with masonry walls. The steel frame is encased in concrete over the lower levels. A concrete staircase and lift shaft are contained within the core and there are flat concrete slabs at roof level.
WSP and others have undertaken visual surveys of the structure generally and identified that water ingress and cracking is present throughout the masonry outer leaf, with significant corrosion to the steel frame within the masonry cavity, which may be leading to some of the masonry cracking, known as Regent Street Disease.
Intrusive work to remove masonry from the Forum Tower are now required to establish the full extent of defects to the steelwork, and specification of remedial repairs required to the steel structure, followed by rebuilding.
It is currently unclear whether the roof top car park will be retained as a car park or changed to maintenance only, however it is understood that the fire strategy requires all staircases to the roof top car park to remain, therefore the tower should be rebuilt once repairs or replacement are completed to maintain access to all levels.
A fee proposal to undertake remedial works by the contractor is now sought for the client's consideration.