Contracts Finder

Wilmslow Park Weir

Environment Agency

Awarded
services
SME-friendly

This tender has closed

The submission deadline for this contract has passed. There may be more active services tenders from Environment Agency, and hundreds more across the UK public sector.

Key details

Contracting authority
Region
London
Contract value
£79,140ex VAT
Submissions closed
4 November 2024
Published
12 December 2024

Procurement

Contract period
2 December 2024 - 31 March 2025
3 months
Procedure type
Call-off from a framework agreement
CPV classifications
  • 90700000 Environmental services

What happened

Environment Agency awarded this contract to Fishtek Consulting worth £79,140 on 27 Nov 2024. The contract runs until 31 Mar 2025.

Description

Wilmslow Park Large Weir is located on the River Bollin, southeast of the town of Wilmslow in East Cheshire, at grid reference SJ8567881137.

The weir is a two-staged weir, approximately 11m wide and 4m high. The weir is over 140 years old and appears to have been constructed for abstraction of water into a mill on the left bank. The mill race is disused and has been closed off for some time. The weir is constructed in large stone masonry with two vertical drops.

Just downstream of Wilmslow Park Large Weir is a smaller weir (Wilmslow Park Weir) at grid reference SJ8531981224, which is approximately 4m wide and 1.5m high.

The land is owned by Bollin Valley Partnership who have established ecological enhancements at the site and therefore we will be working with the Chesire East Council and Bollin Valley Partnership to deliver the project.

The Park is managed by the Bollin Valley Partnership, a collection of landowners (including Cheshire East Council) and conservational organisations, who oversee the management of green infrastructure.

The Mersey is a recovering migratory salmonid catchment, whose improvements are acknowledged in the Salmon Five Point Approach. Historically the catchment had a very productive salmonid fishery, and its potential to support future UK salmon stocks is significant.

In 2004, APEM delivered the report 'A Strategy for The Establishment of Sustainable Populations of Migratory Fish', on behalf of The Environment Agency. This document reviewed habitat information covering the entire Bollin sub catchment and developed a strategy for the re-introduction of salmon to the River Bollin to allow the establishment of self-sustaining populations.

Working upstream from the Manchester Ship Canal, all the weirs identified in the strategy up to Wilmslow Park Weir have either been removed or had a fish pass installed. Therefore, Wilmslow Park Weir is the current upstream limit for salmon on the River Bollin.

The aim is to complete surveys, appraisal and design updates (as appropriate) to deliver detailed design of weir removal for Wilmslow Park Weir and weir removal, weir modification or bypass for Wilmslow Park Large Weir. It is expected that this will be completed in two phases; Phase 1: Option Development and Phase 2: Detailed Design,

Awarded supplier

Supplier
Fishtek Consulting
Award value
£79,140
Award date
27 November 2024

Contact

Address
Seacole Building, Marsham Street, London, SW1P 4DF
Contact name
Harjinder Grewal

Identifiers

Buyer reference
CF-0423100D8d000003VQwdEAG
Notice ID
47400fbe-c35c-431d-933a-81e1f4ab3bef-810329
OCID
ocds-b5fd17-184998de-450d-4cea-9bbc-e9b20aaa4f17

Explore related tenders

External ID: cf-ocds-b5fd17-184998de-450d-4cea-9bbc-e9b20aaa4f17 • Added 3 October 2026