North Wooton Pump and Pre-Cast Concrete Units Supply
Kings Lynn Internal Drainage Board
Key details
Procurement
- 42122000 Pumps
- 44114200 Concrete products
Get alerts when Kings Lynn Internal Drainage Board publishes again
Free lets you browse and discover. Pro emails you the next time Kings Lynn Internal Drainage Board advertises a goods contract.
Description
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project.
The value is estimated at circa £390,000 total. These figures are exclusive of VAT.
The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage.
The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and
providing the required information for the Health and Safety File and Operations and Maintenance Manual.
The Water Management Alliance (WMA) will oversee this procurement on behalf of the King's Lynn Internal Drainage Board working with Turner & Townsend as advisors.
Contact
Identifiers
Explore related tenders
External ID: fts-ocds-h6vhtk-077549 • Added 18 September 2026