HS2 Rolling Stock Manufacture and Maintenance Services
High Speed Two (HS2) Ltd
This goods contract from High Speed Two (HS2) Ltd is closed to new bids. It was awarded to Bombardier Transportation UK Limited, Hitachi Rail Limited and Alstom SA on 17 Dec 2021. Region: West Midlands. Procedure: Negotiated procedure with prior call for competition.
Live now: tenders like this
- Metrolink New Rolling StockTransport for Greater ManchesterCloses 14 December 2026
- Supply, Maintenance and Management of TyresLeeds City Council£4,000,000 · Closes 27 November 2026
- CA18635 - ITT - Security Turnstiles, Roller Shutters, Automatic Doors & Access Control Maintenance ServiceNew College Swindon£80,000 · Closes 2 December 2026
- Purchase and Conversion of Two (2) x Fleet Maintenance Response VansDorset & Wiltshire Fire & Rescue£187,200 · Closes 9 December 2026
- Provision of Customer Information Solution (CIS) Software, Support & MaintenanceNorthern Trains Limited£75,000,000 · Closes 14 December 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
Description
High Speed Two (HS2) Limited is responsible for developing and promoting the new high speed railway known as High Speed 2 ('HS2'), including procuring a fleet of very high speed trains to operate on HS2. HS2 will initially run between London and Birmingham (Phase One) but will subsequently be extended northwards to link Birmingham to Crewe (Phase 2a) and Manchester and Leeds (Phase 2b). All phases will see through trains to other destinations on the UK's conventional network.
Full description
The scope of the supplies to be provided by the Tenderer awarded the Contracts included (but was not be limited to) the following:
1. under a Manufacture and Supply Agreement (MSA), for the Train Manufacturer and Maintainer (TMM) to design, build, test and commission a minimum of 54 new high speed trains, to be delivered in advance of the expected commencement of HS2 Phase One passenger services in late 2029;
2. under a Train Services Agreement (TSA), for the TMM to provide train maintenance, servicing and refurbishment services (as required), and depot facilities management services, for a minimum term of circa 12 years from acceptance of each train;
3. following termination or expiry of the TSA, to continue to provide the necessary technical support and spares to the successor maintainer and repairer of the fleet if required by the HS2 Train Operator under a Technical Support and Spares Supply Agreement ('TSSSA').
The new fleet will need to be capable of operating on new and existing railway routes within the gauge and other constraints of those networks. The trains will need to operate on existing UK infrastructure (initially between Birmingham, Liverpool, Manchester and Glasgow on the West Coast Main Line) and on the UK's new HS2 Network with performance characteristics which deliver the HS2 Programme requirements for capacity and connectivity.
The selection of the TMM was on the basis of most economically advantageous tender.