Workington Laboratory Refurbishment
National Nuclear Laboratory
Key details
Procurement
- 45214610 Laboratory building construction work
- 39180000 Laboratory furniture
- 39181000 Laboratory benching
- 51430000 Installation services of laboratory equipment
- 71900000 Laboratory services
- 79421200 Project-design services other than for construction work
- 79933000 Design support services
Get alerts when National Nuclear Laboratory publishes again
Free lets you browse and discover. Pro emails you the next time National Nuclear Laboratory advertises a works contract.
What happened
The contract runs until 2 Dec 2029.
Description
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL’s Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL’s Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability..
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.
Full description
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL’s Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL’s Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability: -
- 4 off. Fume hoods
- Double Dissolver
- Precipitation Vessel
- Filtration Boat
- Furnace
- Evaporator
- Waste Liquor collection vessel
- Sink
- Foul waste drainage system
- Deionisation machine
- Room extraction ventilation system
- Fume hood ventilation
- Bottle fed argon and nitrogen supply
- Hydrogen monitor
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.