Housing Solutions - Supply and installation of Kitchens and Bathrooms

Housing Solutions

Awarded
works
SME-friendly

This tender has closed

The submission deadline for this contract has passed. There may be more active works tenders from Housing Solutions, and hundreds more across the UK public sector.

Key details

Contracting authority
Housing Solutions
Public undertaking
Region
Berkshire
Delivery: South East England, United Kingdom
Contract value
£6,500,000ex VAT
£6,500,000 inc VAT
Submissions closed
14 July 2025
Published
30 April 2025

Procurement

Contract period
1 April 2026 - 31 March 2029
3 years
Possible extension to 1 April 2031 · 5 years in total
Procedure type
Competitive flexible procedure
CPV classifications
  • 45421151 Installation of fitted kitchens
  • 39141400 Fitted kitchens
  • 45211310 Bathrooms construction work

What happened

Housing Solutions awarded this contract to Kincraig Construction Ltd worth £5,200,000 on 19 Dec 2025. The contract runs until 31 Mar 2029.

Description

Scope and delivery of the work

The work consists of replacement kitchens and bathrooms. We need a contractor to supply and fit these consistent with the specification attached and in the case of kitchen replacements, liaise with both Housing Solutions and the kitchen supplier to carry out joint design surveys. We currently install Howdens kitchens (Greenwich Range) and will most likely continue to fit these. We do not have a direct relationship with Howdens and expect you to negotiate your own prices with them and allow for the supply in your basket rate. We assume you will engage a Resident Liaison Officer (RLO) and will liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works.

Programme scale and duration

We intend appointing for an initial contract period of 3 years with the option to extend for a further two years on a 1 + 1 basis. We operate a two year budget but estimate our 2026-27 – 2028-29 budget will be up to £4m for kitchens and bathrooms and we expect to maintain similar budgets in future years. Therefore we estimate the max term spend to be up to £6.5m.

Geographical distribution

Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes, although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire.

Our 2026-27 programme could consist of approximately 300-500 homes across our estate. Around 70% of our stock are within the Maidenhead area, however there are some homes in other areas like Reading, Farnborough, Wokingham, Slough, Windsor, Bracknell.

Programming

We will leave programming of the work to you. We may have a small number of high-priority cases needing to be done earlier, but in general we would give you our address list for each financial year (April to March) and you can determine your own programme to deliver it. We expect that once work on an individual property have commenced, they are completed within 10 working days for kitchens and 8 working days for bathrooms where practicable and these targets will form part of the KPI suite. The priority is to give the tenant clear timescales, which are met. We would expect essential services (kitchen sink, heating, electricity gas and water) to be restored at the end of each working day.

CDM

We will appoint the Quoin Consultancy as Principal Designer, you will be appointed Principal Contractor. We assume you will prepare the key documents and Quoin will check them against the regulations.

Pricing model

Works will be priced on basket rates per the attached specification with variation on M3NHF SOR Version 7.0. There may be an option to put forward an additional / alternative bid that features another brand (not Howdens).

Ordering and payment

  • Works will be issued on an individual order and variations must be approved in line with the variations process before they are actioned. Final invoiced amounts must be raised within 2 months of completion, to avoid a backlog of invoices.
  • Invoices will not be processed until all certification has been received (Uploaded into a portal or drop box) including, but not limited to electrical certification (installation & minor works), gas safety certificate, kitchen designs, customers selection surveys and customer satisfaction surveys.
  • You will also be expected to update our works portal (Connect) so the progress of all works can be monitored throughout the duration of the contract.

Form of contract

The form of contract will be the JCT Minor Works (MW2024)

KPIs

  • Installations completed within agreed periods
  • 100% Customer satisfaction feedback.
  • 100% Quality inspection pass rate
  • Adherence to programme prepared by contractor
  • Client portal updates.

Awarded supplier

Supplier
Kincraig Construction Ltd
Award value
£5,200,000
Award date
19 December 2025

Contact

Address
Crown House, Crown Square, Berkshire, SL6 8BY
Contact name
Jon Richardson

Identifiers

Notice ID
018109-2025
OCID
ocds-h6vhtk-050a83