Oban Pier Upgrades

Northern Lighthouse Board

Awarded
works
Scotland

This tender has closed

The submission deadline for this contract has passed. There may be more active works tenders from Northern Lighthouse Board, and hundreds more across the UK public sector.

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Northern Lighthouse Board
Public authority - central government
Region
Edinburgh
Delivery: Highlands and Islands, United Kingdom
Contract value
Not stated by buyer
Submissions closed
Not stated by buyer
Published
10 December 2025

Procurement

Contract period
5 January 2026 - 31 March 2026
2 months
Procedure type
Below threshold - open competition
CPV classifications
  • 03419100 Timber products
  • 34516000 Marine fenders
  • 45241300 Pier construction work
  • 45244000 Marine construction works

What happened

Northern Lighthouse Board awarded this contract to George Leslie Ltd worth £247,122 on 7 Nov 2025. The contract runs until 31 Mar 2026.

Description

Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in deeper water. This was then extended in the early 2000’s to provide NLB with a larger operational surface area, extending the central section by approximately 10m and creating new eastern and western sections to the pier. All seaward faces have timber fender piles, though only the central section is currently used for berthing

The scope of works required are as follows:

•Replace 3 No. full pile with like-for-like 360x360mm greenheart pile, replacing brackets, bolts, nuts and spacers as required.

•Replace 3 No. fender with heavy-duty rubber D-fender, replacing fixings as required.

•Replace 6m of stair support waling with like-for-like 360x360mm greenheart waling beam, replacing brackets, nuts and bolts as required.

•Replace total 40m of lower waling with like-for-like 360x360mm greenheart waling beam, replacing splice plates, brackets, nuts and bolts as required.

•Replace 8m of cope beam with like-for-like greenheart members (210x210mm and 260x150mm), replacing fixings as required.

•Replace 24m of cope beam with like-for-like greenheart members (300x150mm), replacing fixings as required.

Potential replacement of galvanised steel ladders and access steps on a like for like basis will also be considered.

We require the contractor to carry out the scope of works below:

•Attend a mandatory site visit to Oban in September 2025 to fully understand the project scope of works and location.

•Provide a detailed tender submission of how they will carry out these upgrades

•Full installation of the repairs and upgrades by the end March 2025.

Timeline

Set out below is the proposed procurement timetable for this project. This is intended to be a guide and whilst NLB does not intend to depart from the timetable, it reserves the right to do so at any time.

Issue of Invitation to Tender – 28th August 2025

Mandatory site visit at Oban depot – proposed Monday 8th September 2025

Clarification deadline for suppliers – 16th September 2025

Tender return deadline – 25th September 2025

Tender Award – by 15th October 2025

Site mobilisation – 24th November 2025

Completion of project – By end March 2025

To view this notice, please click here:

https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=1000322347

Awarded supplier

Supplier
George Leslie Ltd
Award value
£247,122
Award date
7 November 2025

Contact

Address
84 George Street, Northern Lighthouse Board, Edinburgh, EH2 3DA
Contact name
Lindsey Wilkinson

Identifiers

Buyer reference
ENPR/PIER/2538
Notice ID
081527-2025
OCID
ocds-h6vhtk-05839f