Legacy Concrete Roads Reconstruction Framework
National Highways
This works tender from National Highways closed on 5 Mar 2025. It was awarded to Kier Transportation Limited, John Graham Construction Ltd and John Sisk and Son Ltd for £968,000,000 on 9 Feb 2026. Region: East of England. Procedure: Open procedure.
Live now: tenders like this
- Estate Roads Resurfacing Contract 2027Cork City CouncilCloses 10 December 2026
- Managed Debt Collection ServicesGovernment Commercial Agency£650,000,000 · Closes 27 November 2026
- London and Quadrant Housing Trust - Supply/Distribution of Concrete Blocks Dynamic Purchasing System (DPSLondon and Quadrant Housing TrustCloses 10 March 2027
- Vehicle Charging Infrastructure Solutions (VCIS)The Minister for the Cabinet Office acting through Crown Commercial Service (CCS)£450,000,000 · Closes 23 February 2029
- Housing Maintenance & RepairThe Minister for the Cabinet Office acting through Crown Commercial Service£1,500,000,000 · Closes 23 February 2029
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 45233000 Construction, foundation and surface works for highways, roads sector
- 45233100 Construction work for highways, roads sector
- 45233110 Motorway construction works sector
- 45233120 Road construction works sector
- 45233121 Main road construction works sector
- 45233122 Ring road construction work sector
- 45233124 Trunk road construction work sector
- 45233125 Road junction construction work sector
- 45233126 Grade-separated junction construction work sector
- 45233128 Roundabout construction work sector
- 45233130 Construction work for highways sector
- 45233131 Construction work for elevated highways sector
- 45233139 Highway maintenance work sector
- 45233140 Roadworks sector
- 45233141 Road-maintenance works sector
- 45233142 Road-repair works sector
- 45233144 Overpass construction work sector
- 45233210 Surface work for highways sector
- 45233220 Surface work for roads sector
- 45233221 Road-surface painting work sector
- 45233222 Paving and asphalting works sector
- 45233223 Carriageway resurfacing works sector
- 45233224 Dual carriageway construction work sector
- 45233225 Single carriageway construction work sector
- 45233226 Access road construction work sector
- 45233227 Slip road construction work sector
- 45233228 Surface coating construction work sector
- 45233251 Resurfacing works sector
- 45233280 Erection of road-barriers sector
- 45233290 Installation of road signs sector
- 45233292 Installation of safety equipment sector
- 45233294 Installation of road signals sector
- 45233300 Foundation work for highways, roads, streets and footpaths sector
- 45233310 Foundation work for highways sector
- 71320000 Engineering design services sector
- 79415200 Design consultancy services sector
Description
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes.
The framework scope for the LCRR framework includes:
- design and subsequent construction services for:
- demolition of existing concrete pavements,
- reconstruction of pavements (including new pavement furniture and markings)
- design and delivery of associated temporary traffic management solutions,
- when instructed:
- involvement in optioneering,
- design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage, street furniture and its foundations and signage,
- design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings),
- performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”)
- carbon capture recording and reporting,
- recovery, recycling and reuse of arisings during the delivery of a scheme,
- engagement with all identified stakeholders, and
- identification, recording and realisation of programme efficiencies.
The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4.
This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations.
From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
Works will be allocated as per the Framework Information document.
Awarded suppliers (3)
Contact
Identifiers
Explore related tenders
External ID: fts-ocds-h6vhtk-04d58e • Added 6 August 2026