EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

Live
Confirmed tender
works

Key details

Region
Birmingham
Contract value
£500,000ex VAT
Deadline
30 June 2026
Published
23 June 2026

Procurement

Contract period
30 September 2026 - 1 March 2027
6 months
CPV classifications
  • 44114200 Concrete products
  • 45112400 Excavating work
  • 45234123 Partially underground railway works

Get alerts when Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 publishes again

Free lets you browse and discover. Pro emails you the next time Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 advertises a works contract.

What happened

The contract runs until 1 Mar 2027.

Description

NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.

We are seeking a specialist subcontractor to undertake the following works within the NC2A section:

The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications.

The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts.

The Subcontract works include, but are not limited to: Dewatering of excavations as required. Provision of edge protection to ensure that excavation is safe for works Protection of all existing assets Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor. Transfer UTX Chambers from Laydown Area to point of installation Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design Install all units onto the precast concrete base slabs provided by the Contractor. Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions. Supply and install all associated ducting, ensuring compliance with project specifications and drawings. As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor Testing and handover

Contact

Address
Floor 5, 19 Cornwall Street, Birmingham, B3 2DT
Contact name
Chris Read

Identifiers

Buyer reference
C4N114690987
Notice ID
183433b7-20fc-4d4b-827c-d1e515bf47bf-903202
OCID
ocds-b5fd17-10bcec0d-425d-4f34-8f00-c2486ed03536

Explore related tenders

External ID: cf-ocds-b5fd17-10bcec0d-425d-4f34-8f00-c2486ed03536 • Added 23 June 2026