Three Year Gas Servicing Contract 2026-2029
Southside Housing Association Ltd
Key details
Procurement
- 50700000 Repair and maintenance services of building installations
- 50800000 Miscellaneous repair and maintenance services
- 50531000 Repair and maintenance services for non-electrical machinery
- 50531100 Repair and maintenance services of boilers
- 50531200 Gas appliance maintenance services
- 44621000 Radiators and boilers
- 44621100 Radiators
- 44621110 Radiators
- 44621111 Radiators
- 44621200 Boilers
- 44621220 Central-heating boilers
- 44621221 Parts of central-heating boilers
- 39715210 Heating equipment
- 44115200 Plumbing and heating materials
- 44115220 Heating materials
- 44163121 Heating pipes
- 44600000 Tanks, reservoirs and containers; central-heating radiators and boilers
- 44620000 Central-heating radiators and boilers and parts
- 45232141 Heating works
- 45315000 Electrical installation work of heating and other electrical building-equipment
- 45331000 Heating, ventilation and air-conditioning installation work
- 45331100 Central-heating installation work
- 50720000 Repair and maintenance services of central heating
- 50721000 Repair and maintenance services of central heating
Get alerts when Southside Housing Association Ltd publishes again
Free lets you browse and discover. Pro emails you the next time Southside Housing Association Ltd advertises a services contract.
What happened
The contract runs until 22 May 2029.
Description
The Contract primarily involves Gas Servicing throughout tenant occupied properties within the south side of Glasgow. The Contractor will be required to notify customers of mid-market rent properties of the annual gas service appointment not later than 14 weeks prior to expiry of the existing certificate and not later than 10 weeks prior to the existing certificate expiring for all other properties.
The Contract duration is three years (thirty-six months) from the commencement date of 14 September 2026 until the expiry date of 13 September 2029, and will primarily include an annual gas service and reactive maintenance (including parts) to each property, the recording, testing and service to existing smoke, heat and CO detectors, and a check on the condition of the existing gas meter to each property. The proposed works may also include the variation unquantified Modelcodes described within Tender Documents 2 (Pricing Matrix) and 6 (Activity Schedule).
Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document 8) it is intended that the Contract will be further extended annually in twelve months increments up to a maximum of three years and an overall maximum contract period of six years.
Additional information
SPD, Part IV Section C 'Technical and Professional Ability' will be scored on a pass or fail basis using the following scoring methodology;
0 - Unacceptable - Nil or inadequate response. Fails to demonstrate an ability to meet the requirement. A Tenderer which scores ‘0 – Unacceptable’ against any question will be disqualified.
1 - Poor - Response is partially relevant and poor. The response addresses some elements of the requirement but contains insufficient/limited detail or explanation to demonstrate how the requirement will be fulfilled.
2 - Acceptable - Response is relevant and acceptable. The response addresses a broad understanding of the requirement but may lack details on how the requirement will be fulfilled in certain areas.
3 - Good - Response is relevant and good. The response is sufficiently detailed to demonstrate a good understanding and provides details on how the requirements will be fulfilled.
4 – Very Good - Response is largely relevant and very good. The response demonstrates a very good understanding of the requirements and provides adequate details on how the requirements will be fulfilled.
5 - Excellent - Response is completely relevant and excellent overall. The response is comprehensive, unambiguous and demonstrates a thorough understanding of the requirement and provides details of how the requirement will be met in full.
A Tenderer will be required to achieve a minimum score of 2 against each Question within Part C, i.e. a score of 2 or greater shall represent a Pass whereas a score of 1 or lower will represent a Fail.
Southside Housing Association will disregard, and not evaluate the remainder of a Tenderers bid should the Tenderer fail to achieve the minimum score of 2 (a Pass) against any of the Questions included with Part C
How to engage
Gas Safe Register NICEIC or SELECT Electrical Contractors Association of Scotland Bidders will be required to have a minimum 'general' yearly turnover of 220,000 GBP for the last two years or have an average yearly turnover of a minimum of 220,000 GBP for the last two years. Where turnover information is not available for the time period requested, the bidder will be required to state the date which they were set up or started trading. It is a requirement of this contract that bidders hold, or can commit to obtain prior to the commencement of any subsequently awarded contract, the types and levels of insurances indicated below: Employer's (Compulsory) Liability Insurance - 10,000,000 GBP Public Liability Insurance - 10,000,000 GBP Question 4C.1.2 - Bidders will be required to provide two examples of Gas Servicing to domestic properties that are similar to the requirements of Southside Housing Association and demonstrate that they have the relevant experience to deliver the services/supplies as described in part II.1.4 of the Find a Tender Service Contract Notice or the relevant section of the Site Notice. Question 4C.4 - If bidders intend to use a supply chain to deliver the requirements detailed in the Contract Notice, they should confirm they have (or have access to) the relevant supply chain management and tracking systems to ensure a resilient and sustainable supply chain. This will include confirmation that they have the systems in place to pay subcontractors through the supply chain promptly and effectively, and provide evidence when requested of: a) their standard payment terms b) ≥95% of all supply chain invoices being paid on time (in accordance with the terms of contract) in the last financial year. If the bidder is unable to confirm (b) they must provide an improvement plan, signed by their Director, which improves the payment performance. Questions 4C8.1 and 4C8.2 - Bidders will be required to confirm their average annual manpow
Contact
Bid documents
Identifiers
Explore related tenders
External ID: pcs-ocds-r6ebe6-0000832677 • Added 22 May 2026