Redevelopment Ursuline College Sligo
Ursuline College Sligo
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 45000000 Construction work
Get alerts when Ursuline College Sligo publishes again
Free lets you browse and discover. Pro emails you the next time Ursuline College Sligo advertises a works contract.
What happened
The contract runs until 18 Nov 2027.
Description
The Contract is for the redevelopment of Ursuline College Sligo, in the curtilage of the old Ursuline convent -a protected structure in separate ownership. This to be carried over phases while the 750-pupil school and site remains occupied and operational in parallel with the phased redevelopment works. The overall project involves: New Build: 4403m². Includes a 3-storey block, 2-storey General Purpose hall connected to the existing Sports Hall (B15) and a 2-storey link building joined to the 2007-built 2-storey classroom wing (B14). Demolition: 1,897m² of 14no. various buildings, both older extensions connected to retained buildings, prefabricated stand-alone classrooms, lean-to's and out-buildings to be demolished and made good. Holding work: 1,012m² of 4no. historic 2-storey and 3-storey buildings to mitigate further deterioration pending a defined future re-use. (B01,B04 and B09, B12 remnants post demolitions) Retained school areas and refurbishments- 4174m² areas of existing buildings retained, to varying degrees of scopes of works, including; 1. Replacement and upgrade of services to the 2007-built 2-storey classroom wing (1,408m²-B12) 2. Stripping out dry lining and installing new thermal upgrade dry-lining and services and finishes upgrade throughout the main 3-storey 1932 block, including stripping and re-roofing the slate roof (1,505m²-B03) construction of new lift and stairs at knuckle between B14 and B03 3. Conservation and upgrade works including stripping and re-roofing the slate roof to the 1870's Chapel (115m²-BO2) 4. Removal of roof finishes and outer leaf from 2007-built Sports Hall (B15-1,073m²), infill of double height entrance area floor, insertion of additional structure to create a new roof, removal of concrete beams, replacement and new glazing, new finishes and linked interface with new build 2-storey link and GP Room. Protected Structure: Part of the site is in the curtilage of the Ursuline convent and Chapel, a protected structure (RPS No.43). The convent elements is in the ownership of others, and is subject to redevelopment under grant of planning permission( Sligo Co. reference 19183) for re-purposing as residential apartments. The new college campus will have separate staff vehicular entrance - on the north. A student vehicular drop-off/set down improved at the existing Finisklin Road and new hard surface play areas, landscaping, roads and run off surfaces and ancillary services where necessary.
Explore related tenders
External ID: ie-4675234 • Added 18 April 2026