FCDO Accra British High Commission Offices Redevelopment, Ghana
Foreign, Commonwealth and Development Office
Foreign, Commonwealth and Development Office is looking for a works contractor: FCDO Accra British High Commission Offices Redevelopment, Ghana. Category: Construction work. Estimated value £10,791,000. Bids close on 21 Dec 2026. Region: London. Procedure: Competitive flexible procedure.
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
More tenders like this
- Munster Technological University (MTU) High Performance Indoor Athletics Centre (HPAC) at Bishopstown Campus, Cork.Munster Technological University. · €22,000,000 · Closes 30 November 2026
- FCDO Services Global Works FrameworkFCDO Services · £170,000,000 · Closes 7 December 2026
- BHCC - RS - Oakley House Residential RedevelopmentBrighton and Hove City Council · £6,000,000 · Closes 11 December 2026
- PAN3306 - Leicester Station Redevelopment SchemeLeicester City Council · £21,600,000 · Closes 14 December 2026
- Construction of 12 residential units (3 houses and 9 flats) at Maple Place redevelopment, EastleighEastleigh Borough Council · £3,000,000 · Closes 18 December 2026
- Collections Store Refurbishments - Logistics Hub - Principal ContractorNatural History Museum · £1,200,000 · Closes 25 November 2026
Procurement
Description
Project Overview
1.1 The route to market is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage.
1.2 The scope of the project is to redevelop two existing sites (Afadja and Volta) to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance.
1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building.
1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period.
1.5 The existing sites comprises of:
- An existing split-site office building. It is proposed that the Volta building be retained and refurbished.
- Existing plant structures to be demolished to make way for new extension.
- Existing external landscaping to be demolished in some areas to make way for new cloister and walkway.
1.6 Part of the site development design includes:
- Undertaking minor works to the existing Afadja site to make suitable to be used as a decant property whilst works to the Volta building are undertaken.
- Refurbish the existing building to a fit-for-purpose, open plan office standard.
- Replacement of existing mechanical and electrical installations.
- Seismic strengthening and associated structural works.
- External works to create shared internal and external spaces.
1.7 The Contractor, as well as any engaged sub-contractors, are required to perform all work in accordance with the relevant UK Standards. The construction must meet established UK standards throughout the build process.
2. It is anticipated that the works will be undertaken under the NEC form of contract; ECC 4, Option A (Priced Contract with an Activity Schedule).
3. The project team is also considering the inclusion of an Early Contractor Involvement stage ahead of the construction stage. Both stages will be within the same contract.
4. Some areas of the building will be classified as higher security and will require a separate specialist contractor. These works will not form part of this requirement/contract. However, the parameter and interface between the higher classified areas and the works within this requirement will require security cleared personnel at Security Check (SC*) level to manage the works. Contractor’s will need to be able to provide such personnel before the works contract can begin.
*SC is a process of security vetting. Further details can be found at https://www.gov.uk/government/publications/united-kingdom-security-vetting-clearance-levels/national-security-vetting-clearance-levels#security-check-sc.
5. Below is a schedule of key market engagement and tendering activities (subject to change):
Activity Date
Issue PSQ 20th November 2026
Issue ITT Early February 2027
Bidders day During ITT period
Proposed Bid Deadline Late March 2027
Contract Award June 2027
How to engage
Suppliers are invited to complete the Preliminary Market Engagement Questionnaire, which can be found at https://forms.office.com/e/kLxPz9bM5R Please confirm interest by providing responses to the questions in the questionnaire by 17:00 GMT, 23rd February 2026. There may be further market engagement activities such as presentations and meetings. In such case, this notice will be updated. Preliminary Market Engagement is not a downselction exercise. Suppliers who do not take part in the PME will not be precluded from completing and submitting a PSQ.
Contact
Bid documents
Track this tender with a free account to open its bid documents.
Identifiers
Explore related tenders
Other tenders from Foreign, Commonwealth and Development Office
View all →External ID: fts-ocds-h6vhtk-065411 • Added 6 August 2026