Aghafad Pedestrian and Cycle Scheme
Longford County Council
This tender has closed
The submission deadline for this contract has passed. There may be more active works tenders from Longford County Council, and hundreds more across the UK public sector.
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 45200000 Works for complete or part construction and civil engineering work
- 45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
- 45231100 General construction work for pipelines
- 45232130 Storm-water piping construction work
- 45232150 Works related to water-distribution pipelines
- 45233100 Construction work for highways, roads
- 45233161 Footpath construction work
- 45233162 Cycle path construction work
What happened
Longford County Council awarded this contract to Lakeland Civil Engineering Ltd. worth €446,125 on 29 Jan 2026. The contract runs until 29 Aug 2026.
Description
Provision of shared walking and cycle facility from the industrial unit at Aghafad, Longford Town, to link with existing service road along the eastern boundary of the Back Stage theatre and Longford Slashers GAA and thus provide a connection onto the Royal canal Greenway. Ancillary works include the provision of a new water main, drainage, public lighting, accommodation works etc. The scheme will consist of: - Three metre wide, shared pathway, commencing to the immediate east of the existing Longford Slashers GAA entrance and proceeding approximately 400m south west along the L1127 to the Aghafad existing factory entrances, with uncontrolled crossing where required. - Shared pathway to separately advance, approximately 290 metres north along the eastern boundary of Longford Slashers GAA with Prospect Wood, to include the partial redesignation of the existing service road for pedestrian / cyclist provision. - Raised pedestrian / cyclist crossing at the main Slashers GAA entrance, and separate raised pathway crossing to align with the reassignment of existing parking spaces for the purposes of pedestrian / cyclist connectivity to the front entrance door of Slashers GAA / Backstage Theatre. - Accommodation works to include boundary and entrance treatment to main entrance and that of the upper Slasher GAA / Backstage Theatre / Gaelscoil Longfoirt carpark, relocation / redesign of existing public lighting poles, signage, drainage, etc. - Provision of new water main to replace section of existing asbestos water main.
Awarded supplier
Contact
Explore related tenders
External ID: ie-5916714 • Added 18 April 2026