Offshore Renewable Energy Catapult
This services tender from Offshore Renewable Energy Catapult closed on 20 Feb 2023. It was awarded to DNV UK LIMITED for £35,240 on 3 Apr 2023. The contract end date is 9 Jun 2023. Region: North East. Procedure: Open procedure (below threshold).
Contracts like this usually come back out to tender before they end.
Live now: tenders like this
- Transformer Testing ServicesUK Atomic Energy AuthorityCloses 27 November 2026
- Detailed Project Design (DPD) for the Hoo Peninsula Heat NetworkMedway Council£100,000 · Closes 3 December 2026
- Managing Assets Management – Coastal Northern Ireland tenderThe Crown Estate£330,000 · Closes 15 December 2026
- Management Consultancy Dynamic MarketUnited Utilities Water LimitedCloses 3 November 2030
- Dynamic Market for Process Safety Consulting & MaintenanceWessex Water Services Ltd
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
Description
This project is a technology agnostic high-level study of the costs, risks and opportunities for different cable topology and cable connection methods (including subsea wet mate connectors) for offshore floating wind, in comparison to a more conventional topology in a daisy chain configuration between turbines. This study is important as it aims to answer the following questions:
- What topologies will potentially be used for future FOW sites (e.g. daisy chain, fishbone, or star)?
- What type of connectors will be required and their current technology readiness level (TRL) in the subsea sector (i.e. what is going to be available in 2025 to 2030)?
- What are the expected failure modes and reliability level of cable array topologies using subsea connectors versus conventional daisy chain arrangements? How does this influence the overall array-level system reliability and redundancy?
- What are the installation characteristics of the comparative array topologies for installation and disconnection (i.e. required vessels and equipment, time scales, any additional risks and uncertainties)?
- What are the comparative purchase, installation and O&M costs for different connector and topology combinations?