BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor
Brighton & Hove City Council
This tender has closed
The submission deadline for this contract has passed. There may be more active works tenders from Brighton & Hove City Council, and hundreds more across the UK public sector.
Key details
Procurement
- 45000000 Construction work
What happened
Brighton & Hove City Council awarded this contract to J.T.MACKLEY & CO.LIMITED worth £12,500,000 on 2 Sept 2024. The contract runs until 30 Apr 2025.
Description
Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark. At 865m
long in total it is one of the longest cast-iron structures in the world and an admired piece of
Victorian architecture, integral to the Eastern Seafront. It is also a significant Grade 2* listed
structure within the rich heritage context of the wider coastal city. Phase 1 of the Madeira
Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent
steps and the Shelter Hall / Concord 2.
The cast iron structure forms a backbone describing the historic development of the
seafront. Addressing the sea and the beach firmly braced against the rising East Cliff wall
rising behind. It is a 'backdrop': designed and intended to be used and inhabited by the
residents of the city for all manner of events and social occasions; for quiet enjoyment,
outdoor exercise and for viewing.
The structure is now deemed unsafe and public access has not been possible for a number of
years, due its condition.
The Phase 1 project includes the following elements of works:
- Conservation and repair of the historic cast iron structure.
- Conservation and management of the historic Japanese Spindle green wall [dating from
1872], and other planting associated with the Green Wall.
- Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure
public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure.
- Public realm landscaping to both the terrace deck above and the promenade walkway
below, including new hard surfacing, soft landscaping and street furniture.
- Local improvement to Madeira Drive, via new pedestrian crossing points.
- New lighting and servicing infrastructure
- Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2
building, to allow its continued historic function as the original means of step-free access to
the terrace.
- A new external public lift
Awarded supplier
Contact
Identifiers
Explore related tenders
External ID: cf-ocds-b5fd17-20d4b095-8185-4327-83c8-4f9ea796fec8 • Added 3 October 2026