Contracts Finder

Fit Out - WP12.2.2 - WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV

Awarded
works
Private sector
Subcontract
SME-friendly

This works tender from Balfour Beatty VINCI Systra JV closed on 7 Feb 2024. It was awarded to Kilnbridge Construction Services Ltd on 3 Jan 2025. Estimated value £2,500,000. The contract end date is 28 Nov 2025. Region: London.

Contracts like this usually come back out to tender before they end.

Live now: tenders like this

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Region
London
Delivery: London, United Kingdom
Contract value
£2,500,000ex VAT
Submissions closed
7 February 2024
Published
15 January 2025

Procurement

Contract period
21 April 2025 - 28 November 2025
7 months
CPV classifications

Description

WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelworks

Scope of work

WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork Envelope consists of the design for construction and manufacture, supply, installation, and assurance of structural steelworks to the accommodation blocks, Lift & Escalator Electrical Room (LEER) on HS2 platform level, central core on concourse level, 'T' shaped lower-level escalator supports on HS2 platform, and 'V' shaped intermediate level escalator supports. The scope of works comprises the following:

Levels: HS2 Station Platform Level & Concourse Level

Elements: Structural steel

Design Development: Prepare the design for construction and manufacture, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements, ancillary elements, and products to meet the prescribed performance requirements.

Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards.

Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for construction in accordance with the approved design.

Assurance and Certification: Generate and supply comprehensive assurance documentation.

Coordination: Ensure coordination with various substrates, and other finishes to achieve integration within the overall project

Additional information: No Documentation is included at this point.

Awarded supplier

Award date
3 January 2025

Contact

Address
Astral House Imperial Way, Watford, WD244WW
Contact name
Manish Tailor

Identifiers

Buyer reference
C4A77510209
Notice ID
9b722ea9-6da5-4564-95ce-1aa3b608838a-817432
OCID
ocds-b5fd17-e7435787-6208-4a90-b498-923034c03e7c

Explore related tenders

External ID: cf-ocds-b5fd17-e7435787-6208-4a90-b498-923034c03e7c • Added 3 October 2026

Get tenders like these by email

Tell us what you do and where you work. Every morning you get the new tenders that fit, from national portals and the buyer portals most services miss.

14 days of Pro, no card. Then Free unless you upgrade.