BBV Sublot 1B Tunnel Grout Treatment
Balfour Beatty VINCI JV HS2
This tender is closed to new bids.
Live now: tenders like this
- Kingsway Tunnel - Asbestos Insulating Board (AIB) 'Dado' Panels RemovalMerseytravelCloses 11 November 2026
- PS/26/182 Shawfarm Road, Prestwick - Investigation and Remedial Treatment of Anomalous Ground ConditionsEast Ayrshire CouncilCloses 27 November 2026
- BBV Sublot 4 - HSST1020 - SALTLEY VIADUCT GABION WALLBalfour Beatty VINCI JV HS2Closes 13 November 2026
- Framework Agreement for the Application of Mould TreatmentCity & County of SwanseaCloses 4 December 2026
- Water Treatment Services including Water Risk AsesssmentsEducation PortalCloses 10 November 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
What happened
The contract runs until 22 Jan 2027.
Description
"Ground Treatment "
The SC (Subcontractor) will assess the findings of the probe hole investigation and will develop the grout treatment strategy to be followed with a scope to minimize any excess water ingress during CP excavation and improve the ground stability.
Grouting operations will include stage permeation grouting on max 1m steps, with the use of packers. Subcontractor based on ground and ground-water conditions as revealed from ground investigation (probe holes) shall develop the grouting strategy. The strategy will include as a minimum but not exclusively the following:
- A grouting pattern of primary and secondary on the periphery of CP profile
- Drilling diameter, orientation, and lengths of each grouting hole
- Bottom-up grouting stages with the use of packers. The grouting stages should not exceed the
length of 1m.
- In case required (unstable ground) Subcontractor may need to make use of a tube a
manchette TAM (sleeve pipes) system to perform the grouting. In this case the strategy should be developed accordingly.
- Mix design(s) of the grout injection
- Max Pressure and max Volume criteria for stopping each grouting stage
- Tertiary drilling holes in case primary and secondary do not reach the target criteria.
- As built records grouting locations lengths stages grout consumptions and max pressure. "
Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).