DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME
CPD - Construction Division
This tender has closed
The submission deadline for this contract has passed. There may be more active works tenders from CPD - Construction Division, and hundreds more across the UK public sector.
Key details
Procurement
- 45200000 Works for complete or part construction and civil engineering work
- 45240000 Construction work for water projects
- 45262211 Pile driving
What happened
CPD - Construction Division awarded this contract to DAWSON-WAM LTD worth £5,097,612 on 26 Oct 2021. The contract runs until 9 Mar 2023.
Description
The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.
45km comprising a combination of sheet pile flood walls (approx. 0. 45km), secant pile flood walls (approx 0.
89km) and piled earth embankments (approx. 0. 11km).
The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.
Awarded supplier
Contact
Identifiers
Explore related tenders