Find a Tender Service

Tender for the Supply and Installation an Ammonia Storage & Vaporisation Unit to the University of Birmingham

The University Of Birmingham

Awarded
goods

This tender has closed

The submission deadline for this contract has passed. There may be more active goods tenders from The University Of Birmingham, and hundreds more across the UK public sector.

Get tenders like this by email

New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.

Unsubscribe in one click. See our privacy policy.

Key details

Contracting authority
Region
BIRMINGHAM
Delivery: UKG31
Contract value
Not stated by buyer
Submissions closed
26 September 2022
Published
26 August 2022

Procurement

Contract period
Until 1 May 2023
Submission method
Electronic Submission
Procedure type
Open procedure
CPV classifications
  • 24110000 Industrial gases
  • 24413000 Ammonia

What happened

The University Of Birmingham awarded this contract to Star Refrigeration Limited on 30 Sept 2022. The contract runs until 1 May 2023.

Description

The University of Birmingham invites tenders for the supply of an ammonia storage and vaporisation unit capable of supplying ammonia at:

  • 70kg/hr
  • 8.0 Barg
  • ≥25oC

The unit is part of a BEIS funded programme to construct an ammonia cracking plant to produce green hydrogen. The Tyseley Ammonia Project will design, build, commission, and operate the world's largest and most efficient ammonia to hydrogen conversion unit, demonstrating 200kg/day production of transport-grade hydrogen. It will be located at Tyseley Energy Park and co-located alongside an existing refuelling station. The hydrogen will be used to refuel local vehicles including 20 fuel cell buses that have been ordered by Birmingham City Council. The ammonia cracker combines decomposition and purification stages into a single, compact unit, with lower operational temperatures due to recent innovations in membrane technology. The project aims to dramatically improve the efficiency and economics of ammonia cracking, accelerate the development of hydrogen solutions in the UK and position the country at the forefront of an emerging global market.

The project is led by Gemserv, with partners EQUANS, H2SITE, Storengy, Yara, University of Birmingham and Tyseley Energy Park.

The ammonia unit will be integrated into ammonia cracking plant, being provided by other partners with operations being the responsibility of EQUANS.

This project may be funded by the European Regional Development Fund (ERDF) or;

  • European Structural and Investment Fund (ESIF) or;
  • Research Councils UK (RCUK), the strategic partnership of the UK's seven Research Councils.

Full description

An initial FEED study for the ammonia storage and vaporisation unit has been commissioned from STAR technical solutions and the design is set out in the series of accompanying documents:

  • 136800-001B.Ammonia P&ID.pdf [Ammonia plant P&ID document]
  • 136800-002A.Equipment Layout.pdf [pdf of Equipment layout]
  • 136800-002A.Equipment Layout.dwg [drawing file of Equipment layout]
  • 136800-003A.Calulations.pdf [Calculations used in the plant design]
  • 136800-004B.Principles of Operation.pdf [Description of how plant should operate]
  • 136800-005A.Concept Design Ammonia Hazard Assessment.pdf
  • 136800-006A.Hazard and Operability Study.pdf
  • HAZOP Drawing.pdf
  • HAZOP Keywords.pdf
  • Hsg71 - Chemical Warehousing.pdf

The tender should comply with the specification as set out in these documents. All documents should be considered in detail as part of the tendering process.

The design of the ammonia storage and vaporisation unit base is to deliver ammonia at:

  • 70kg/hr
  • 8.0 Barg
  • ≥25oC

Further requirements/considerations include (see documents for details):

  • Small quantities of water are contained in ammonia when supplied by BOC. When transferring ammonia liquid from the drum tanks, water is also transferred. This added water must not affect the operation of the vaporiser. A system to separate the water from liquid ammonia must be included. The separated water must have a system to allow it to be decanted safely.
  • The facility may require the ammonia delivery pressure to be reduced or increased. The design must be capable of supplying ammonia vapour at stable pressures between 6 to 10 Barg.
  • The drum tank weight must be measured in position to know if the drum tanks are ready to be swapped out.
  • Under no circumstance, the equipment operation will result in any back filling of the BOC drum tanks with liquid ammonia resulting in overcharging the drum tanks.
  • The safety systems that must be included are those detailed in BS EN378 Part 1 to 4 and any standards referenced. Ammonia is used in refrigeration systems and all the safety requirements within these standards apply to this project.
  • The adding of ammonia to the system must be simple; no venting of liquid when removing hoses and any vapour must be vented through water in a controlled manner

Awarded supplier

Supplier
Star Refrigeration Limited
Award date
30 September 2022

Contact

Address
Chancellors Close, Birmingham, B152TT
Contact name
Kseniya Samsonik

Identifiers

Buyer reference
SC11053/22
Notice ID
023937-2022
OCID
ocds-h6vhtk-036355

Explore related tenders

External ID: fts-ocds-h6vhtk-036355 • Added 20 August 2026