Find a Tender Service

SBRI Cycle 2 Phase 2 Further Competition

United Kingdom Atomic Energy Authority

Awarded
services
2 lots

This tender has closed

The submission deadline for this contract has passed. There may be more active services tenders from United Kingdom Atomic Energy Authority, and hundreds more across the UK public sector.

Key details

Contracting authority
Region
Abingdon
Delivery: UKJ1
Contract value
£534,939 - £1,499,705ex VAT
Submissions closed
Not stated by buyer
Published
19 September 2023

Procurement

Procedure type
Award procedure without prior publication of a call for competition
CPV classifications
  • 73110000 Research services

What happened

United Kingdom Atomic Energy Authority awarded this contract to TWI LIMITED | CAL GAVIN LIMITED | Duality Quantum Photonics | Alloyed Limited | Full Matrix Ltd | Jacobs | Oxford Sigma | The University of Birmingham | 3-Sci worth £999,428 on 18 Aug 2023.

Description

This is a Small Business Research Initiative (SBRI) competition funded by the UK Atomic Energy Authority. The aim of the competition is to develop solutions to fusion energy challenges in two key priority areas. The competition has two themes. Theme 1: Driving up fusion power plant performance with innovative heating and cooling systems Theme 2: Improving fusion power plant availability with novel fusion materials, technology, and manufacture

This is also a Phase 2 Competition from the successful delivery of Phase 1.

Full description

A Phase 2 Pre-Commercial Procurement under SBRI.

1. Driving up fusion power plant performance with innovative heating and cooling systems.

Projects can focus on one or more of the following under this theme:

Microwave heating challenges:

high power, long pulse microwave sources with high electrical efficiency (greater than or equal to 55%)

development of special waveguide components, for example, diamond window assemblies, power monitors, expansion units, vacuum pumping access

improvements on the high voltage power supplies (50kV) for reduced voltage ripple in a compact assembly while maintaining high electrical efficiency (greater than or equal to 98%)

development of optical mirrors for evacuation of high thermal loads (approximately 5MW/m2)

high precision optical alignment assemblies for the free space to waveguide coupling

Neutral particle beam heating challenges:

negative ion beam system with high electrical efficiency (greater than 60%)

improved beam neutralisation efficiency, for example, Plasma or Laser Neutralisers

development of residual ion energy recovery.

improved negative ion source efficiency with caesium free operation

reduction in scale; improved ion optics, source uniformity and power handling to reduce size of components

development of actively cooled high heat flux components (approximately 5-10 MW/m2) with reactor relevant materials

development of fault tolerant 1-2MV fast switching power supply systems with high electrical efficiency

development of vacuum pumping systems with pumping speeds of millions of litres per second which allow continuous operation

Reactor high heat flux components:

jet impingement cooling technology transfer

sCO2 as coolant

diamond components for heat dispersion

novel discrete limiter designs, for example, vaporisation layers, speed of maintenance or increased heat flux performance Additional information: All applicants that received a total average score of 7 were invited to the second stage of the evaluation, which was an assessment centre, evaluated across four overarching topics, scored out of 5.

Awarded suppliers (10)

Suppliers
  • TWI LIMITED
  • CAL GAVIN LIMITED
  • Duality Quantum Photonics
  • Alloyed Limited
  • Full Matrix Ltd
  • Jacobs
  • Oxford Sigma
  • TWI Limited
  • The University of Birmingham
  • 3-Sci
Award value
£999,428
Award date
18 August 2023

Contact

Address
Culham Science Centre, Abingdon, OX14 3DB
Contact name
Vincent Tsang

Identifiers

Buyer reference
T/CMK053/23
Notice ID
027558-2023
OCID
ocds-h6vhtk-0401c9

Explore related tenders

External ID: fts-ocds-h6vhtk-0401c9 • Added 20 August 2026