Rail Package 2 Camp Hill Line New Stations
West Midlands Combined Authority
This tender has closed
The submission deadline for this contract has passed. There may be more active works tenders from West Midlands Combined Authority, and hundreds more across the UK public sector.
Key details
Procurement
- 45213321 Railway station construction work
What happened
West Midlands Combined Authority awarded this contract to Volkerfitzpatrick Ltd worth £27,000,000 on 20 Apr 2022.
Description
The Project will consist of the design and construction of (3) three new stations at Moseley, Kings Heath and Hazelwell and supporting rail infrastructure works, on the Camp Hill Line between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area."
- The above is a description of the original procurement *
Full description
Project Overview:
We are seeking to appoint a Principal Contractor on a design and build basis under a NEC 4 ECC Target Cost Contract to construct 3 new stations at Moseley, Kings Heath and Hazelwell including supporting rail infrastructure works.
The timeline for completion is 31/03/2024, although an earlier completion date is desired.
Further to holding an extensive market briefing and engagement event, we have listened to market concerns and have refined the approach and content of the procurement and requirements in a number of areas to address potential issues where possible.
WMCA propose to incorporate Clause X1 into the building contract to alleviate Contractors risk on material price fluctuations. This will cover primary materials such as timber, concrete and steel and the codes from BCIS will be provided at ITT.
Further Information:
The new stations are on the route between Birmingham New Street and Kings Norton to support access for new train services that increase connectivity in the Greater Birmingham area. To meet this objective the project shall deliver:
Moseley
- Two 6-car platforms (operational length 150m)
- Pedestrian access to the station comprising 2no. raised walkways, stairs and lifts
- Geotechnical works including piling and soil nailing
- Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS Incoming DNO, LV Power Supply/Distribution System.
- Permanent Way slew through platforms and associated lineside drainage
- Passenger drop-off area with connecting highway access from the adjacent B4217 St Mary’s Row.
- Upgrading current highway network to signalized junction to support the above drop off point.
Kings Heath
- Two 6-car platforms (operational length 150m);
- Pedestrian access to the station including a footbridge, lifts and stairs
- Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS, Incoming DNO, LV Power Supply/Distribution System.
- Permanent Way slew through platforms and associated lineside drainage
- A435 High Street highway upgrade
Hazelwell
- Two 6-car platforms (operational length 150m);
- Pedestrian access to the station inc. stairs and lifts
- Platform waiting canopies, lighting, CCTV, Ticket Vending Machines, Passenger Help Points, PA, CIS, Incoming DNO, LV Power Supply/Distribution System.
- Permanent Way slew through platforms and associated lineside drainage
- Passenger drop-off area with connecting highway access from the adjacent Cartland Road.
Tenderers are directed to the Project Summary, Scope and the design information for a detailed description of the proposed stations.
- The above is a description of the original procurement *