Find a Tender Service

WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools

Wiltshire Council

Awarded
works

This tender has closed

The submission deadline for this contract has passed. There may be more active works tenders from Wiltshire Council, and hundreds more across the UK public sector.

Key details

Contracting authority
Wiltshire Council
Public authority - sub-central government
Region
Trowbridge
Delivery: UKK15, United Kingdom
Contract value
£6,054,892ex VAT
Submissions closed
Not stated by buyer
Published
17 December 2025

Procurement

Contract period
23 July 2025 - 23 July 2027
2 years
Procedure type
Competitive flexible procedure
CPV classifications
  • 45214000 Construction work for buildings relating to education and research
  • 71000000 Architectural, construction, engineering and inspection services

What happened

Wiltshire Council awarded this contract to STEPNELL LIMITED worth £5,812,696 on 10 Nov 2025. The contract runs until 23 Jul 2027.

Description

Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire.

Stage 1 of the procurement process is to seek expressions of interest from prospective Contractors with a view to shortlisting a maximum of four Contractors to be invited to submit a tender for the project.

Stage 2 of the procurement process will be the Invitation to Tender (ITT) itself.

The Requirement:

The following schools have been identified by the Council as having temporary classrooms which are in a dilapidate state and are in need of replacement by way of either new build developments (Hullavington and Minety), and internal alterations and refurbishment of existing school buildings (Frogwell Primary School):

1. Frogwell Primary School, Chippenham,

2. Hullavington Primary School, Hullavington, Chippenham,

3. Minety Primary School, Malmesbury

The purpose of this procurement opportunity is to appoint a contractor on a full design and build basis, in the first instance operating under a Pre-Construction Services Agreement and working closely with the Schools and the Council through RIBA Work Stages 1 to 4. This Stage 1 appointment will include the following outputs:

1. Operating under a single PCSA to deliver the RIBA Work Stages 1 to 4 inclusive for each of the three schools including.

2. The appointment of a Design Team to work with the School and the Employers Representative to fully design each of the three projects to the end of RIBA Stage 4 (technical/construction design) and to present the design for approval at the end of each RIBA work stage including cost plans for Employer approval,

3. To develop a detailed programme for RIBA Stages 1 to 7 for acceptance by the Employer for each of the three projects,

4. To obtain Building Regulations approval and Planning Permission for each of the three projects,

5. To work collaboratively with the Employers Representative to produce a Fixed Price Lump Sum to deliver the construction works for each of the three projects for approval by the Employer.

On acceptance by the Council of the fixed price lump sum costs to deliver the construction works for each of the three projects, individual construction contracts will be entered into (JCT Intermediate form of contract with Contractor Design) for each school site. These will be the Stage 2 works, and each school project will be delivered as a standalone project through RIBA Work Stages 5, 6 and 7 (Construction, Handover and in Use).

The indicative forecast cost estimate for the Stage 1 pre-construction works is £450k + VAT and the indicative forecast cost estimate of the Stage 2 post contract works is:

Frogwell Primary School £2.0m + VAT = £2.4m

Hullavington Primary School £2.0m + VAT = £2.4m

Minety Primary School £0.75m + VAT = £0.9m

---------------------------

Total Estimated Construction Cost incl VAT £5.7m

Key Programme Dates as follows:

RIBA Stages 1 to 4 End August 25 to End March 26

Package Pricing Stage End March 26 to End June 26

Final Design & Fixed Price Lump Sum Approvals End June 26 to Mid July 26

RIBA Stage 5 Construction Start August 26

Handover To be agreed for each of the school sites during the pre-construction stage of the project

Awarded supplier

Supplier
Award value
£5,812,696
Award date
10 November 2025

Contact

Address
County Hall, Bythesea Road, Trowbridge, BA14 8JQ
Contact name
Ms Rachel Candy

Identifiers

Buyer reference
WO2151
Notice ID
083846-2025
OCID
ocds-h6vhtk-04f8e8