Demolition & Structural Alterations
Courtauld Institute Of Art
This works tender from Courtauld Institute Of Art closed on 27 Aug 2026. It was awarded to KILNBRIDGE CONSTRUCTION SERVICES LTD. for £6,045,620 on 22 Sept 2026. The contract end date is 8 Nov 2027. Region: London. Procedure: Open procedure.
Contracts like this usually come back out to tender before they end.
Live now: tenders like this
- Demolition, Design and Construction of Howard's Lane Public Toilets, Howard's Lane, WarehamWareham Town Council£140,000 · Closes 15 January 2027
- Glassford Community Hall - Partial Demolition, Extension and RefurbishmentGlassford Community Group£1,500,000 · Closes 4 December 2026
- EA RFCA Welwyn Garden City Demolition and New BuildReserve Forces' and Cadets' Associations of East Anglia£1,200,000 · Closes 18 December 2026
- Demolition of block Retaining Wall and reinstatement with Gabion Wall, Dursley, Gloucestershire.Stroud District Council£41,666 · Closes 4 December 2026
- Demolition of Bell House, Barker House and associated garagesStoke on Trent City Council£300,000 · Closes 11 December 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 45111100 Demolition work sector
- 45111200 Site preparation and clearance work sector
- 45223200 Structural works sector
- 45261420 Waterproofing work sector
- 45262100 Scaffolding work sector
- 45262400 Structural steel erection work sector
- 45262660 Asbestos-removal work sector
- 45262700 Building alteration work sector
Description
All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford
Watson Mann and Purcell design drawings;
Demolition of Strand floor, facade, and other elements as specified by the design engineers;
Survey and investigation works required to ensure design and methodology is completed in time
within the restraints of the existing structure;
Localised noise, dust and vibration monitoring;
Clean and re-use of existing brickwork for new wall installs;
Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing;
Formation and infills to all pockets formed for new structure install, both for this package and other
(i.e. Structural Steelwork), including padstones and steel bearing plates;
All mass poured, pre-cast, or reinforced concrete works including the new stair core, stairs,
underpinning, pads, ramps, slabs and upstands;
All dry packing, grouting, and encasement to steel members, including those installed by Others;
Attendance and return visits required for the above installs by Others;
External Luxcrete repairs;
CCTV and repairs of existing below ground drainage. CCTV of new drainage;
Install of items free issued by others (e.g. cast-in plates by Structural Steelwork contractor);
Where shown in package split, all new primary and secondary steelwork, connections, metal deck,
intumescent coating, padstones, steel bearing plates and dry packing;
Alterations to existing structure including formation of new risers and services penetrations, box
frames and trimmer steels and timbers;
3rd party review and confirmation of any intumescent and fire stopping installs;
Forming of all new lift pits including underpinning, reinforcement and waterproof concrete;
Installation of all waterproofing, blinding, insulation and sump (including commissioning)
requirements;
Facade and party wall retention propping to facilitate demolition Works;
Demolition of existing stairwell in the East Wing including all associated temporary works, and infill
of new landing;
All blockwork and brick walls as shown in package split including windposts;
Form new openings including lintels, beams, posts;
Re-levelling of existing floor substrates;
Removal and excavation of existing screed and slabs, including localised repaires where required;
Covering or edge protection install to all voids and openings formed by the Works;
Installation of riser flooring systems to all newly formed and existing riser opening;
Strengthening of existing beams, including services opening coordination and formation;
Removal or containment of any asbestos (e.g. Strand buildings timber flooring), lead, guano and
anthrax where required to complete the Works, with appropriate measures in place;
Removal, protection and off-site storage of heritage items such as stone beams and flags, grilles,
fireplaces and hearths;
Removal of existing heritage windows following surveys by Others;
Installation of tower crane base including piles and cap;
Fire and corrosion protection to steel in-situ application (new only);
Temporary & permanent steel bracing;
Protection of all existing heritage finishes (where at risk of damage from the works);
All scaffolding and crash decks to facilitate the works (e.g. Strand south facade elevation);
Propping of existing vaults at Strand;
Underslab drainage works and GRP sumps;
Surveys of existing structure, looking ahead on programme to avoid last minute discoverables;
Install of gulleys, manhole covers and associated below-ground drainage components;
Awarded supplier
Contact
Identifiers
Explore related tenders
External ID: fts-ocds-h6vhtk-06cb61 • Added 14 July 2026