Allerton Building AHU Replacement
University of Salford
This works contract from University of Salford is closed to new bids. It was awarded to Environment & Power Technology Ltd for £226,793 on 3 Sept 2026. The contract end date is 9 Oct 2026. Region: North West. Procedure: Below threshold - award under framework.
Contracts like this usually come back out to tender before they end.
Live now: tenders like this
- Standby Power Generator Replacement for Research BuildingsMHRA£860,000 · Closes 2 December 2026
- Tender for internal alterations and flat roof replacement works to existing school building at Cavan No. 1 School at Farnham St, Abbeyland, CavanCavan No 1 NS Cavan Town€180,000 · Closes 27 November 2026
- PRO005124 – Works – Dynamic Market – Building, Operations, Labour & Trade ServicesUnited Utilities Water LimitedCloses 13 December 2034
- Replacement Village PlaygroundLaneshaw Bridge Parish Council£110,000 · Closes 24 November 2026
- The Refurbishment of Building 42 to Create a New Gas Incident Investigation LaboratoryHealth and Safety Executive£350,000 · Closes 27 November 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
Description
The University is the single occupier of the Allerton Building. The building houses professional services, teaching spaces and a canteen on the ground floor. The building is located centrally on the Frederick Road Campus. The proposed works will take place on the 2nd floor roof area and within the ALS202 study space directly below.
The existing Air Handling Unit (AHU) and associated equipment have reached the end of their serviceable life and are therefore scheduled for replacement. The current unit is situated on the 2nd floor roof area of the Allerton Building and provides ventilation to the ALS202 study space below. The existing AHU is currently supported on a timber support plinth, which is damaged and showing signs of deterioration. As part of the proposed works, this will be removed and the roof covering reinstated. The new system will be supported on a steel platform, which will be installed as part of the works.
Awarded supplier
Contact
Identifiers
Explore related tenders
External ID: fts-ocds-h6vhtk-06c55f • Added 7 July 2026