S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews
National Highways Limited
This services tender from National Highways Limited closed on 8 Apr 2026. It was awarded to AtkinsRéalis Jacobs Joint Venture for £272,959 on 2 Jul 2026. The contract end date is 31 Mar 2029. Region: West Midlands. Procedure: Call-off from a framework agreement.
Contracts like this usually come back out to tender before they end.
Live now: tenders like this
- 1085739477 T1432 Developing the Risk Profile of Children and Young People at Level CrossingsRail Safety Standards Board (RSSB)£50,000 · Closes 18 December 2026
- Post Office Branch - High Street, GillinghamPost Office Limited£60,000 · Closes 19 February 2027
- Procurement of a High-Precision Optical Ground Station (OGS) Telescope Unit for Uplink and Satellite TrackingMbryonics Ltd€420,000 · Closes 4 December 2026
- Limerick City and County Council Consultancy Services for the inspection, design, procurement, construction and handover phases of Bridge Rehabilitation Works in County Limerick 2027 - 2031Limerick City and County Council€400,000 · Closes 7 December 2026
- PONV 013 - Playing Pitch Strategy and Open Space Needs AssessmentShropshire Council£72,000 · Closes 3 December 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
Description
Barton High Level Bridge (BHLB) is an eighteen-span steel-concrete composite
structure carrying the M60 over the Manchester Ship Canal. The original bridge,
constructed in 1960, comprised two independent deck halves formed from four
longitudinal composite girders each, separated by a central reserve joint and supported
by reinforced concrete bank seat abutments and hollow-column piers. The bridge was
later widened between 1986 and 1989 as part of the M63 improvement works, with new
edge girders and an extended deck slab added on both sides. Pre-widening
investigations identified slight alkali-aggregate reactivity (AAR) in the original concrete,
prompting a change in design approach. Instead of creating monolithic widened piers,
the new outer supports were redesigned as independent, free-standing hollow
reinforced-concrete columns founded on separate piles and connected to the original
piers via link-and-pin "Pin Bearings". This configuration allowed independent vertical
behaviour while constraining lateral and longitudinal movement, with the understanding
that long-term monitoring and periodic bearing adjustments would be required to
manage differential movements.