SUPPLY CHAIN NOTICE -Central Substation RIBA4 & Build
Ministry of Defence
Ministry of Defence is looking for a supplier of goods: SUPPLY CHAIN NOTICE -Central Substation RIBA4 & Build. Category: Substation construction work. Estimated value £4,500,000. Bids close on 1 Jul 2027. Region: North West.
Published on the buyer's own procurement portal
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
More tenders like this
- D20/CON/882 - Works associated with the Design and Build of High Voltage Electrical Substations in the Republic of IrelandElectricity Supply Board ( ESB )
- Terra Nova Supply Chain DPS (Terra Nova Supply Chain DPS)Great Places Housing Group · Closes 31 October 2027
- Supply Chain Notice - WC2126918 - XSP513 - Refurbishment of Sports Facility (Running Track), Dhekelia, CYPRUSMinistry of Defence · £300,000 · Closes 25 November 2026
- 9165 Single Supplier Framework Agreement for Design and Build Signalling and Telecoms Contractor for DART +Iarnród Eireann-Irish Rail · €325,000,000 · Closes 16 December 2026
- 25/059 - Qualification System for Telecoms Infrastructure Design, Build and MaintenanceGas Networks Ireland · Closes 17 March 2036
- Pre-construction Services (PCSA) for Design and Build of Temporary Accommodation at Ridgeview, London Colney and Creighton Avenue Garage Site, St AlbansPublic Sector Partnership Services Ltd · £6,500,000 · Closes 4 December 2026
Procurement
Description
The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below – a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages.
In summary, this Project includes the following work packages:
Project Phase 1 (Design) includes the following work packages:
- WP 1: Survey and assessment work to facilitate the RIBA 4 design.
- WP 2: RIBA 4 Technical Design incl. all temporary works designs.
- WP 3: Undertake earthing design for Central Substation.
Project Phase 2 (Build) includes the following work package:
- WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1.
Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.
Those that meet the criteria of this initial phase will be invited to participate in a final competition. Deadlines for expressions of interest are the 27th March. Any expressions received after this date will not be accepted
Notes: Full details can be found in Contracts Finder
https://www.contractsfinder.service.gov.uk/Notice/550e2499-b437-4f0b-8773-b1f3cf975927