A66 - Sheet Piles
Balfour Beatty Civil Engineering Limited
This tender is closed to new bids.
Live now: tenders like this
- Removal of Piles and Timber at the Former Dolphinarium in Blowing PointGovernment of AnguillaCloses 19 November 2026
- London and Quadrant Housing Trust - Vinyl Sheet Flooring (Supply Only) 2026 -2030L&Q Supply Chain ManagementCloses 11 November 2026
- BSH/HRA/Supply of Double Glazed Units and Sheet Glass - DPSBristol City CouncilCloses 30 November 2026
- Supply of Cabins to a holiday rental business in County CarlowBilboa Hills LtdCloses 3 December 2026
- P-3429 Management of Translink NI Bus SheltersTranslinkCloses 1 December 2026
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
- 44212410 Sheet piling
What happened
The contract runs until 24 Apr 2028.
Description
1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b.
2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply:
- Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements.
2.2 Installation of Sheet Piles The Contractor shall undertake:
- Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems.
- Removal of sheet piles upon completion of works.
2.3 Associated Works The Contractor shall complete associated activities including:
- Pile guide frames
- Dewatering screens
- Structural support components
2.4 Pre Construction & Site Activities Activities include:
- Mobilisation and site establishment
- Setting out
- QA testing
- Preparation of record drawings and certification
2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with:
- BD 21/01
- National Highways Specification
- Relevant BS/EN/Eurocode standards
- CDM Regulations
________________________________________ 4. Key Supplier Requirements The Contractor must:
- Demonstrate capability to manage CDM and SHES risks
- Provide method statements, vibration and noise mitigation plans
- Coordinate closely with Temporary Works Designers
- Collaborate with the Balfour Beatty site and engineering teams
- Submit all required QA documentation, including testing and certification evidence
________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including:
- Early award and resource confirmation to reduce over commitment risks
- Managing vibration and settlement risks through pre condition surveys and real time monitoring
- Mitigating design or construction clashes through integrated design reviews and 3D coordination
- Minimising traffic management delays via advanced planning and flexible work slots
- Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms
________________________________________ 7. Deliverables The Contractor shall provide:
- Complete installation of specified sheet piling works
- Full QA documentation including test results and certification
- As built / record drawings
Contact
Identifiers
Explore related tenders
External ID: cf-ocds-b5fd17-e39f13c2-839c-4446-9628-de54c20a7117 • Added 29 April 2026