Legacy Concrete Roads Reconstruction Framework
National Highways Limited
This works tender from National Highways Limited closed on 26 Mar 2025. It was awarded to Kier Transportation Limited, John Graham Construction Ltd and John Sisk and Son Ltd for £968,000,000 on 9 Feb 2026. The contract end date is 8 Feb 2032. Region: East of England. Procedure: Open procedure (above threshold).
Contracts like this usually come back out to tender before they end.
Live now: tenders like this
- Estate Roads Resurfacing Contract 2027Cork City CouncilCloses 10 December 2026
- London and Quadrant Housing Trust - Supply/Distribution of Concrete Blocks Dynamic Purchasing System (DPSLondon and Quadrant Housing TrustCloses 10 March 2027
- Electricity Infrastructure WorksProcurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton)£125,000,000 · Closes 31 May 2029
- Gigabit Infrastructure Subsidy Programme - Dynamic Purchasing System (DPS)Building Digital UK (BDUK)£2,000,000,000 · Closes 6 April 2030
- Energy Management Solutions Dynamic MarketUniversity of Essex£1,200,000,000 · Closes 12 October 2036
Get tenders like this by email
New tenders like this one, in your inbox every morning. Starts with 14 days of Pro, no card needed.
Unsubscribe in one click. See our privacy policy.
Key details
Procurement
Description
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes:
- design and subsequent construction services for:
- demolition of existing concrete pavements,
- reconstruction of pavements (including new pavement furniture and markings)
- design and delivery of associated temporary traffic management solutions,
- when instructed:
- involvement in optioneering,
- design and construction of alterations to those legacy assets which interface with the replacement pavements' designs, which may include sub-surface drainage, street furniture and its foundations and signage,
- design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings),
- performing principal designer and principal contractor duties as defined under the "Construction
(Design and Management) Regulations 2015" ("CDM Regulations 2015"),
- carbon capture recording and reporting,
- recovery, recycling and reuse of arisings during the delivery of a scheme,
- engagement with all identified stakeholders, and
- identification, recording and realisation of programme efficiencies.
The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4.
This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations.
From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
Awarded suppliers (3)
Contact
Identifiers
Explore related tenders
External ID: cf-ocds-b5fd17-42ae9037-0c21-457b-8baf-f212e117f189 • Added 29 April 2026